1
00:00:00,200 --> 00:00:05,839
The horizontal wells are basically development,
so you're probably talking about an eighteen to

2
00:00:05,960 --> 00:00:12,240
ninety percent CHATS success. The expectation
is that we're going to have soloware get

3
00:00:12,279 --> 00:00:17,879
dwing six studio undered barrels a day
for well that includes the risk of the

4
00:00:18,359 --> 00:00:23,440
ninety percent chats a success. We've
included the geology, We've included the Seisnick

5
00:00:23,879 --> 00:00:30,519
and we picked locations right next to
our tested oil to find the best locations

6
00:00:31,120 --> 00:00:36,200
duel so they have sixty seventy percent
chats of each adding unored barrels a d

7
00:00:36,600 --> 00:00:48,079
The Financial Survival Network now more than
ever, the Financial Survival Network, and

8
00:00:48,200 --> 00:00:52,840
welcome. This is Financial Survival Network. I'm your host, Kerry Lutz,

9
00:00:53,280 --> 00:00:57,479
and we are going to get an
update from one of my largest holdings,

10
00:00:57,520 --> 00:01:02,240
Prosperity Energy. We're going to find
out about the upcoming drill programming, what

11
00:01:02,399 --> 00:01:07,000
else is ahead. Samuel David CEO, George mcgarian, VP of Subsurface are

12
00:01:07,120 --> 00:01:12,560
here with me. Sam glad you're
back. So rough winter up your way,

13
00:01:14,120 --> 00:01:21,519
rough winter for for Prospera with the
weather and production issues. The winters

14
00:01:21,560 --> 00:01:26,040
are always harsh and Saskatchwan and especially
in the latter part of quarter too,

15
00:01:26,200 --> 00:01:32,840
on most part of quarter one.
Those four months we have scheduled all our

16
00:01:32,879 --> 00:01:38,280
Phase two development in the summer months. We've been steadily working towards to have

17
00:01:38,439 --> 00:01:42,719
the rig on site to drill,
and then the rig is also scheduled for

18
00:01:42,760 --> 00:01:49,599
the first first few weeks of August, both for the horizontals and the verticals

19
00:01:49,959 --> 00:01:55,079
for the light oil as well.
That's ten horizontals, eight verdicals. Just

20
00:01:55,120 --> 00:02:00,560
as we planned these summer months,
we've invaded a survey, acquiring the leases,

21
00:02:00,799 --> 00:02:06,359
constructing and getting license and permits to
construct. So every this week progressing,

22
00:02:07,359 --> 00:02:12,360
we have obtained the well license and
then wee scheduled as well, and

23
00:02:12,520 --> 00:02:15,599
all those services are coordinated. Just
to give you an example, a horizontal

24
00:02:15,800 --> 00:02:23,240
takes about one hundred different types of
services utilized and working consortium to do these

25
00:02:23,319 --> 00:02:29,800
kind of horizontal wealths. We are
drilling it to depleted reservoirs, so we

26
00:02:29,919 --> 00:02:36,400
have to be very careful on also
circulation. So all of those technical challenges

27
00:02:36,759 --> 00:02:43,080
we have piloted, and we have
addressed the technical risks and the economic side

28
00:02:43,080 --> 00:02:46,520
of it as well in coordinating the
services and getting the terms, party terms

29
00:02:46,560 --> 00:02:52,199
and all those kind of things.
The team has made steadily working and we're

30
00:02:52,240 --> 00:02:59,080
ready to go August first week after
the long weekend, because hey, if

31
00:02:59,120 --> 00:03:02,680
you drill in the long weekend,
it's double over time. Okay, so

32
00:03:02,759 --> 00:03:08,599
we're doing right after the long weekend, okay. And currently production, what

33
00:03:08,639 --> 00:03:14,319
are we looking at. We're looking
at about a thousand boies, but we

34
00:03:14,360 --> 00:03:20,719
still have about thirty thirty two fifty
cubes on just engines and rods and flushed

35
00:03:20,759 --> 00:03:24,960
by those kind of things, and
those are being coordinated so that that additional

36
00:03:25,520 --> 00:03:31,039
three hundred EOIs will be added here
in the betch few weeks. And as

37
00:03:31,039 --> 00:03:36,199
far as production come the end of
the year, weather permitting, what do

38
00:03:36,240 --> 00:03:40,039
you think will be at well,
We have taken the weather into consideration in

39
00:03:40,159 --> 00:03:46,199
our forecast, initial forecasts, and
that hasn't changed. George, it's great

40
00:03:46,199 --> 00:03:50,080
to have you on, great to
meet you. Understand, you've got banks

41
00:03:50,080 --> 00:03:54,199
and you've got thirty six years of
petroleum geology under your belt. A lot

42
00:03:54,280 --> 00:04:02,439
of the fields you've developed during this
time tell us eighteen Walsh, that's doable

43
00:04:02,520 --> 00:04:08,000
for the time period allotted. Yeah, no, no problem. I mean

44
00:04:08,080 --> 00:04:15,120
that the horizontal wells probably take about
a week to drill. That's ten weeks

45
00:04:15,120 --> 00:04:17,959
of drilling. He wanted to add
out, you know, one back to

46
00:04:18,040 --> 00:04:24,519
back to back the vertical wells,
he shouldn't. Shouldn't take that long mail

47
00:04:24,759 --> 00:04:30,639
build babe, or five days those
can be again, uh, drills back

48
00:04:30,680 --> 00:04:33,000
to back to back, and you
know that within a month you could have

49
00:04:33,199 --> 00:04:38,040
most of the wells drilled. We
have everything ready to build, all at

50
00:04:38,040 --> 00:04:43,720
the same time. So yeah,
the timeline is not an issue from it

51
00:04:43,879 --> 00:04:48,399
from the drilling perspecting all right,
and in your experience, and like we

52
00:04:48,439 --> 00:04:55,519
said, you've got vast experience.
What is the pro prospectivity of those wells?

53
00:04:55,560 --> 00:05:00,399
Look like the horizontal wells are basically
development, so you're probably talking about

54
00:05:00,439 --> 00:05:06,279
an eighteen to ninety percent chants of
success. The expectation is that we're going

55
00:05:06,360 --> 00:05:12,800
to have soloware got Dwayne sixty to
hundred barrels a day er well that includes

56
00:05:12,920 --> 00:05:16,439
the risk of lead to ninety percent
chants of success. They're going to bring

57
00:05:16,439 --> 00:05:20,639
on some bit production with a high
chance of success. Now. But yeah,

58
00:05:20,720 --> 00:05:25,839
the other wells of the verticals,
I wouldn't call them development. Maybe

59
00:05:25,879 --> 00:05:30,800
would call them outposts. I don't
know if that's the term that the investors

60
00:05:30,839 --> 00:05:34,000
would know about, but basically what
you're saying with an outposts that you're drilling

61
00:05:34,079 --> 00:05:40,439
right next to an established well.
We included the geology, we've included the

62
00:05:40,480 --> 00:05:46,800
seize nick and we picked locations right
next to our tested oil to find the

63
00:05:46,800 --> 00:05:54,560
best locations can drill so that they
have sixty seventy percent chants each adding huttered

64
00:05:54,600 --> 00:05:59,759
darrels a day, so we could
see quite a bit more and Sam.

65
00:05:59,759 --> 00:06:04,199
As far as bringing those wells into
production, are there any particular challenges there?

66
00:06:04,639 --> 00:06:09,720
What's the time frame once the wheel
is drilled, assuming it's successful,

67
00:06:10,240 --> 00:06:14,600
but just prior to that, those
that seismic that George referred to, those

68
00:06:14,639 --> 00:06:18,079
are all three D seismic. We
have three D size both both areas,

69
00:06:18,600 --> 00:06:25,040
and these locations were picked with three
D size and well control and it's very

70
00:06:25,040 --> 00:06:29,720
similar to the Actually, George was
pretty excited that these ones that we're going

71
00:06:29,759 --> 00:06:33,240
to drill looked a little bit better
than the wells that we proved, so

72
00:06:33,360 --> 00:06:38,839
we're excited about that. Now,
for the horizontals, we're drilling from existing

73
00:06:39,079 --> 00:06:43,959
least ten meters away from my existing
well, so it's a matter of tying

74
00:06:44,000 --> 00:06:48,879
into existing facility, so the horizontal
wells will come out a lot quicker within

75
00:06:48,920 --> 00:06:53,639
a few weeks of drilling, and
we'll do the completion with the landing the

76
00:06:53,680 --> 00:06:57,879
pump at the same time. We'll
tie it in and it's all pipeline to

77
00:06:57,920 --> 00:07:02,399
the facilities. So the horizontal production, we can see it quite rapidly.

78
00:07:03,480 --> 00:07:08,240
The medium light oil, it's a
new development area, so we have to

79
00:07:08,279 --> 00:07:13,360
acquire new lease, and we'll also
have to construct some of the things that

80
00:07:13,399 --> 00:07:15,680
are associated with the new lease.
We have to bring a new equipment,

81
00:07:16,079 --> 00:07:23,120
and we have sourced all of that
out the technical tea, the facility pipeline

82
00:07:23,160 --> 00:07:30,600
teams, as all the plants we're
proceeding with that that'll take a little a

83
00:07:30,639 --> 00:07:34,279
little bit more time, probably another
than a half because all those permits we

84
00:07:34,480 --> 00:07:40,519
have been working on it since the
sun started. So if I were bold

85
00:07:40,519 --> 00:07:44,399
to say by a quarter three,
we shouldn't have all of them all.

86
00:07:44,800 --> 00:07:50,240
Conceivably all eighteen wales could be online
by a quarter three, which is quite

87
00:07:50,279 --> 00:07:56,240
an accomplishment. There seems to be
confusion as to when the drill program was

88
00:07:56,279 --> 00:07:59,759
going to start. I knew there
are, Like you said, there's hundreds

89
00:07:59,759 --> 00:08:05,199
of moving parts to a program under
way. So if you're a few weeks

90
00:08:05,319 --> 00:08:09,160
early or a few weeks late.
It's not significant in so far as the

91
00:08:09,240 --> 00:08:13,759
weather goes, and still getting the
program done, is it. We were

92
00:08:15,439 --> 00:08:20,920
planning for July August, drill in
late July, in mid August, so

93
00:08:20,800 --> 00:08:26,600
maybe there was a confusion, uh
that it could be that instantly. There

94
00:08:26,759 --> 00:08:31,639
is a lot of have you I
moving especially for a small company for us,

95
00:08:31,720 --> 00:08:35,440
this is a big program as far
as we're consacked, were we're opped

96
00:08:35,559 --> 00:08:39,879
argot and all our teams would working
hard quickly, But there's always permits and

97
00:08:41,120 --> 00:08:43,720
weather and all that. But I'd
say we're opped argot. Yes. As

98
00:08:43,759 --> 00:08:50,720
far as finances go and the cash
flow, um I noticed, well,

99
00:08:50,080 --> 00:08:56,919
last year obviously had record cash flow
from operations. It was up multiples of

100
00:08:56,919 --> 00:09:03,120
where it was before. And latest
release indicates that you have more than enough

101
00:09:03,159 --> 00:09:07,240
cash on him to finance the program. Well, you never have more than

102
00:09:07,720 --> 00:09:11,840
more that we did. You know
in quarter one, as you recall,

103
00:09:13,399 --> 00:09:18,320
the winter was pretty harsh, so
you know the production was down. There

104
00:09:18,399 --> 00:09:22,519
was also the commodity press that has
been honest, it is getting a little

105
00:09:22,559 --> 00:09:28,200
better in the last few weeks we
noticed, but nevertheless, we're set to

106
00:09:28,799 --> 00:09:35,440
drill and finance these projects, especially
with the exercise of the warrants and sustained

107
00:09:35,480 --> 00:09:41,480
cash flow as well. All right, and George, So as far as

108
00:09:41,519 --> 00:09:48,840
the composition of the oil you were
you said there's medium and light to present,

109
00:09:48,919 --> 00:09:52,639
which was a surprise. Well,
the medium light is in the the

110
00:09:52,720 --> 00:09:58,759
Alberta Fairway. Uh, we're we're
pursuing the Hammy is obviously a Saskatchewan outset.

111
00:10:00,159 --> 00:10:07,200
The medium light will will darner a
better price than the heavy that we're

112
00:10:07,240 --> 00:10:13,360
producing in Saskatchewan. Also, the
medium light oil is uh, it's radical

113
00:10:13,399 --> 00:10:18,200
weals, ariz optal whatsoever, our
directional wealths, so they will be drilled

114
00:10:18,279 --> 00:10:24,440
quicker than ariz optical weals as well. So it'll be able to bring those

115
00:10:24,600 --> 00:10:31,159
medium light oil radical or slanted wells
a little bit quicker and cheaper as well

116
00:10:31,240 --> 00:10:35,960
in terms of capital outlay. We've
talked before that the company is actively seeking

117
00:10:37,679 --> 00:10:41,679
acquisition. Sam, Can you just
I realize there's a limit to how much

118
00:10:41,720 --> 00:10:45,440
information you can give us on that. Can you give us the broad outline

119
00:10:45,480 --> 00:10:48,879
of where you're at in that process
acquas you shouldn't. We plan and the

120
00:10:48,000 --> 00:10:54,799
core area to expand in the core
area is still in progress. It is

121
00:10:56,000 --> 00:11:01,279
back at forth and in terms of
discarding the exact pool that we want.

122
00:11:01,519 --> 00:11:07,159
And you know, the talk is
still there and we're proceeding towards the pools

123
00:11:07,200 --> 00:11:11,799
that we walked, not just all
the liabilities surrounding it, you know,

124
00:11:11,960 --> 00:11:16,279
which is when we wanted to get
at. But that conversation is in progress,

125
00:11:16,879 --> 00:11:20,080
all right. I realized that there's
a limit to what you can tell

126
00:11:20,159 --> 00:11:24,200
us about it. But it's good
to know that it's still alive and you're

127
00:11:24,240 --> 00:11:31,960
moving ahead. And so is there
anything else? What about the polymer flooding

128
00:11:31,960 --> 00:11:37,720
in the upgrading? Anything good?
It's there a good question. We're moving

129
00:11:37,799 --> 00:11:43,360
towards a pilot, we're getting ready
for application as well. That work for

130
00:11:43,399 --> 00:11:50,759
spament steadily progress as well, and
we also have chosen the type of polymer

131
00:11:50,840 --> 00:11:56,600
that we need as well, and
so we've been we're going with vendors at

132
00:11:56,120 --> 00:12:03,039
moving towards the application and a pilot
as we plat right. And what about

133
00:12:03,200 --> 00:12:09,600
the other the new technology that actually
takes heavy oil and turns it into better

134
00:12:09,639 --> 00:12:16,440
than WTI I hope, so that
is also proceeding as well, where you

135
00:12:16,519 --> 00:12:20,759
have moped into the experimental stage of
that. News is going to be coming

136
00:12:20,759 --> 00:12:26,039
out to the next week or so
where we're supplying our samples and the experiment

137
00:12:26,159 --> 00:12:33,600
it's going to commence and we should
be receiving an idle report of the experiment

138
00:12:33,759 --> 00:12:37,200
at the end of the year.
All right. So there's a lot happening.

139
00:12:37,600 --> 00:12:43,639
And like anything else there in the
normal ebb and flow of the companies,

140
00:12:43,679 --> 00:12:48,879
there's active periods and there's not so
active periods. Sometimes there's a lot

141
00:12:48,919 --> 00:12:52,840
of action taking place under the surface
and you don't see it, which obviously

142
00:12:52,960 --> 00:12:58,159
is what's been happening here with Prospera. So look, go over to prosperit

143
00:12:58,320 --> 00:13:03,320
Energy dot com. Sign up for
notifications so you'll get these news releases as

144
00:13:03,399 --> 00:13:07,440
they come. The ticker symbols in
the US g x r f F.

145
00:13:09,000 --> 00:13:13,279
In Canada, of course, it's
Pei, Sam, George. Thanks for

146
00:13:13,320 --> 00:13:16,440
coming on and we will be following
up with you in the months ahead.

147
00:13:16,399 --> 00:13:20,480
Thank you. Carry yeah, i'd
like to see that, okay, thank

148
00:13:20,480 --> 00:13:30,240