1
00:00:35,159 --> 00:00:38,039
What Up? What Up? What
Up? Everybody? Welcome to another episode

2
00:00:38,039 --> 00:00:41,159
of Let's Ask Paul, the podcast
where I, Paul Abernet at the answer

3
00:00:41,280 --> 00:00:46,560
all of your pressing electrical code related
questions. But all you gotta do is

4
00:00:46,600 --> 00:00:50,920
go to Paul Abernathy dot com.
It's a free service offered by a well,

5
00:00:50,960 --> 00:00:53,640
it's sponsored by Wicks, and it's
free for all of you to be

6
00:00:53,679 --> 00:00:56,960
able to come and ask me any
electrical question that you want to ask me.

7
00:00:57,520 --> 00:01:00,240
All you gotta do is go to
Paul Abernathy dot com, it in

8
00:01:00,280 --> 00:01:04,439
your name, email and submit your
question and if selected, will be utilized

9
00:01:04,480 --> 00:01:11,439
on an upcoming podcast much like today's
podcast. But you can rest assured I

10
00:01:11,480 --> 00:01:17,920
will answer your questions via email.
If it needs additional clarification, I want

11
00:01:17,920 --> 00:01:19,359
you to have the best possible to
answer you. Again, so again,

12
00:01:19,760 --> 00:01:27,719
utilize that free service that's available to
anybody over at Paul Abernathy dot com.

13
00:01:27,719 --> 00:01:34,040
Another free service that we provide here
at Electrical Code Academy. A couple updates,

14
00:01:34,040 --> 00:01:38,760
I'll tell you on this podcast we
are adding a new service again,

15
00:01:38,879 --> 00:01:46,000
always trying to enhance electricians and spread
it out there so that they get a

16
00:01:46,000 --> 00:01:52,599
bunch of exposure. We have just
signed a deal we will be expanding and

17
00:01:52,760 --> 00:01:59,159
adding an online directory just for electricians. So it will be something that all

18
00:01:59,200 --> 00:02:01,079
of our students and all the people
that work with us will be able to

19
00:02:01,120 --> 00:02:06,040
add their listing for free. And
as we promote it, we have a

20
00:02:06,079 --> 00:02:10,280
budget planned to promote that around the
country and it's going to promote electricians and

21
00:02:10,360 --> 00:02:13,879
you can be the first to list
your company in it. It's not going

22
00:02:13,919 --> 00:02:16,639
to cost you anything, so that's
something we got going. Also, if

23
00:02:16,680 --> 00:02:20,879
you haven't checked it out yet,
every business out there needs to have a

24
00:02:20,919 --> 00:02:24,199
website, without a doubt. You
need to have a website, whether it's

25
00:02:24,199 --> 00:02:28,520
just an e commerce website, whether
or not it's just promoting your business.

26
00:02:29,599 --> 00:02:31,800
Do me a favor. When you
get a chance, go to Empire Butler

27
00:02:32,319 --> 00:02:38,639
dot com and it's exactly how it
sounds. Empire emp I R E Butler

28
00:02:38,759 --> 00:02:46,400
Butler dot com and check out the
templates that you can get. They're all

29
00:02:46,439 --> 00:02:51,000
customizable. It's a drop and drag. It's so simple. We'll even help

30
00:02:51,039 --> 00:02:53,199
you out if you have any questions
about any element that you want to add.

31
00:02:54,159 --> 00:02:58,120
But it is great to get your
business on the internet and if you

32
00:02:58,159 --> 00:03:01,680
already have a website. Trust me, more is better. So these are

33
00:03:01,719 --> 00:03:07,080
just inexpensive ways to get more exposure
on the Internet and to be able to

34
00:03:07,120 --> 00:03:14,080
share your business on web business cards, on your different publications you might do

35
00:03:14,199 --> 00:03:16,360
wherever you want to do it.
We offer a service that is all part

36
00:03:16,400 --> 00:03:22,840
of Electrical Code Academy. Many people
don't know that we have many divisions within

37
00:03:22,960 --> 00:03:27,360
Electrical Code Academy incorporated. Our electrical
training is just one division of that.

38
00:03:27,560 --> 00:03:30,520
Obviously I'm more intimate with that one. But we do have many other services

39
00:03:30,560 --> 00:03:37,800
available, and you can see all
the services that we have at butlersuite dot

40
00:03:37,800 --> 00:03:40,840
com. But we have PPM Butler, which is project management software. We

41
00:03:40,879 --> 00:03:46,840
have accountant Butler, we have Profile
Butler, we have Empire Butler. Many

42
00:03:46,879 --> 00:03:51,120
ways to get your exposure online.
Check those out. We'll put links to

43
00:03:51,159 --> 00:03:55,319
those done in the description of this
podcast. All right, all right,

44
00:03:55,360 --> 00:03:59,680
so today I have it. Let's
ask Paul and I will say we are

45
00:03:59,680 --> 00:04:03,680
also were streaming live on TikTok,
not answering questions on TikTok, but we

46
00:04:03,719 --> 00:04:10,599
are streaming live on TikTok, and
we want to make sure that I answered

47
00:04:10,599 --> 00:04:14,000
this question accurate because this could be
a long one today, and I'm sure

48
00:04:14,080 --> 00:04:18,959
that TikTok folks won't hang in there
that long. Okay, that's a three

49
00:04:19,000 --> 00:04:24,920
minute platform. Tension spans probably less. But I have a question. It

50
00:04:25,000 --> 00:04:29,439
was submitted to me, and this
question was, Paul, can you teach

51
00:04:29,560 --> 00:04:32,959
me a little bit more about MC
cable? It's uses, it's not permitted

52
00:04:33,040 --> 00:04:36,439
uses. What's the difference in the
types of MC cables and some examples where

53
00:04:36,439 --> 00:04:44,560
you can and can't use MC?
Metal clad cable? Okay, So one

54
00:04:44,600 --> 00:04:48,199
of the more popular wiring methods out
there, probably for residential, the most

55
00:04:48,199 --> 00:04:54,839
popular is no metallic sheeth cable.
The second most popular, probably residentially and

56
00:04:54,920 --> 00:04:59,920
like commercial, is going to be
metal clad cable. Now, three time

57
00:05:00,000 --> 00:05:02,399
types of MC cables that are available
in the industry. Okay. The most

58
00:05:02,399 --> 00:05:08,920
predominant is called an interlock. Now. Interlock type of MC is made by

59
00:05:09,079 --> 00:05:13,879
taking a perplexed set of conductors,
running it through a machine that creates what's

60
00:05:13,920 --> 00:05:18,480
called we call it a bird beak, but actually it wraps a continuous reel

61
00:05:18,720 --> 00:05:25,360
of metal armor. It wraps it
around that cable assembly, and then as

62
00:05:25,360 --> 00:05:29,079
it's wrapping it around, it has
a little beak that bends it and turns

63
00:05:29,120 --> 00:05:33,600
it, and it actually kind of
creates the spiral and it interlocks it.

64
00:05:33,800 --> 00:05:38,199
That's why it's called interlocked, okay, so it shouldn't be able to pull

65
00:05:38,240 --> 00:05:43,480
apart. And of course the other
type is smooth and corrugated. Now,

66
00:05:43,560 --> 00:05:47,600
smooth it kind of sounds just like
it is. It is a constant extrusion,

67
00:05:48,639 --> 00:05:53,439
and it's extruded out just like you
would like an EMT would be.

68
00:05:54,920 --> 00:06:00,319
And then there's the corrugated, and
typically corrugated is welded. Okay, it's

69
00:06:00,920 --> 00:06:06,199
essentially like an interlocked, but it
has a welding component that welds the different

70
00:06:06,480 --> 00:06:14,959
convolutions together. Still as flexibility obviously
not as flexible as interlock, but it

71
00:06:15,480 --> 00:06:18,879
there are some benefits to smooth and
corrugated. Smooth and corrugated, you can

72
00:06:18,959 --> 00:06:25,120
actually use the armor as an equipment
ground in place of having to have one

73
00:06:25,160 --> 00:06:29,079
inside of the cable assembly, whereas
interlocked that's not going to work. Now,

74
00:06:29,079 --> 00:06:34,040
there are specialty products like Southwire has
a product called mcap Uncoal wire as

75
00:06:34,079 --> 00:06:41,319
a product called smart ground, and
you can use the armor as an equipment

76
00:06:41,319 --> 00:06:46,120
ground and those specialty products, but
only up to conductor size. Is a

77
00:06:46,160 --> 00:06:49,720
six gage. Okay, so anything
larger than that. Obviously, with interlocked

78
00:06:49,839 --> 00:06:51,879
ms that you can't use the armor
and you still have to bond it,

79
00:06:53,000 --> 00:06:56,839
but you can't use it as an
equipment ground. Okay, that's not the

80
00:06:56,920 --> 00:07:02,720
case with corrugated and smooth. Now
corgating smooth type of MC cable, I

81
00:07:02,720 --> 00:07:08,079
can use that armor as an equipment
ground. Okay, So it eliminates the

82
00:07:08,120 --> 00:07:12,759
need for a separate equipment ground and
conductor inside the cable assembly. All right,

83
00:07:12,839 --> 00:07:15,000
but that's just a kind of a
quick overview of that. Let's get

84
00:07:15,040 --> 00:07:20,279
a little bit more deeper into talking
about MC cable and trying to answer this

85
00:07:20,360 --> 00:07:25,399
gentleman's question here. And remember,
if you have questions, you can always

86
00:07:25,480 --> 00:07:29,920
submit your questions to me at Paul
Abernathy dot com. Please make sure you

87
00:07:30,000 --> 00:07:32,920
do that. All right, we're
talking about metal claud cable. There's multiple

88
00:07:32,920 --> 00:07:36,199
types of metal clad cable. They
all have to be listed. Dot six

89
00:07:36,199 --> 00:07:42,279
of Article three thirty requires that they
all be listed. Now most I would

90
00:07:42,279 --> 00:07:46,040
say, all of the wiring methods
are are required to be listed now.

91
00:07:46,079 --> 00:07:50,879
Dot six is the listing requirement.
And if you're following along, I'm in

92
00:07:53,319 --> 00:07:57,399
the twenty twenty three edition of the
National Electrical Code. Right, so I

93
00:07:57,480 --> 00:08:01,000
have transitioned. Whether you have or
not, whether you're stays using Again,

94
00:08:01,519 --> 00:08:03,639
it's usually irrelevant to me. Because
I'm an educator, I always go with

95
00:08:03,680 --> 00:08:09,079
the latest addition. I do ask
people to when they ask me a question,

96
00:08:09,519 --> 00:08:15,399
I like them to ask me a
question and let me know what code

97
00:08:15,480 --> 00:08:20,040
cycle they're in, because again I
can be more relevant to the cycle there

98
00:08:20,079 --> 00:08:22,399
is. Otherwise I'm going to give
you an answer that's in the twenty twenty

99
00:08:22,439 --> 00:08:24,759
three. That's just the way it
works, all right. Now, let's

100
00:08:24,800 --> 00:08:30,920
talk about some uses permitted for mc
cable. A lot of misconceptions about the

101
00:08:30,959 --> 00:08:35,960
application and use. MC cable is
perfectly permitted to use for services, feeders

102
00:08:35,960 --> 00:08:39,759
and brand circuits applications, whether it's
small conductor size, long feeder, mid

103
00:08:39,879 --> 00:08:45,120
sizes with four outs two fifty three, fifties, four hundred case email,

104
00:08:45,559 --> 00:08:50,320
perfectly fine. But again use for
service feeders and brand circuits. Again,

105
00:08:50,440 --> 00:08:56,879
also utilize for both power and lighting, even control and signal applications. Most

106
00:08:56,879 --> 00:09:00,840
people know that there's products on the
market that have this zero to ten vault

107
00:09:00,960 --> 00:09:05,200
control and signal inside of the same
cable assembly as the power conductors that is

108
00:09:05,480 --> 00:09:11,399
permitted in the National Electrical Code,
but that's also my patents. I have

109
00:09:11,440 --> 00:09:16,559
about four patents on that, and
again we don't aggressively fight the patent.

110
00:09:16,679 --> 00:09:20,039
I really don't care if other manufacturers
make it. I don't make anything from

111
00:09:20,080 --> 00:09:26,039
these patents, but I am the
patent holder of that. Anytime you grab

112
00:09:26,120 --> 00:09:30,600
that MC cable and you have those
zero to ten vaults in there, I

113
00:09:30,639 --> 00:09:33,360
am My name is attached to that
patent. Yeah, I don't make a

114
00:09:33,399 --> 00:09:37,159
diamond on that. Because when you
work for a manufacturer, you know,

115
00:09:37,200 --> 00:09:41,320
they get all the rewards. I
like to say, I got a job

116
00:09:41,679 --> 00:09:46,919
so that you know takes care of
that. Now, MC cable. When

117
00:09:46,919 --> 00:09:50,600
you're looking at three thirty ten,
people get kind of confused when it talks

118
00:09:50,600 --> 00:09:54,120
about the general use because it says
indoors or outdoor use. You know,

119
00:09:54,159 --> 00:09:58,639
that's item number three. What they
don't understand is indoor means just flat out

120
00:09:58,720 --> 00:10:03,559
you can use the MC indoor outdoors. If it's a wet or damp location,

121
00:10:03,000 --> 00:10:07,519
then you have to do something extra. It has to be some type

122
00:10:07,519 --> 00:10:15,000
of impervious jacket that is corrosive resistant, that's extruded over top of the armor.

123
00:10:15,080 --> 00:10:20,519
Itself. Okay, So when we
think about that, you know,

124
00:10:20,879 --> 00:10:24,080
we make MC cable people. You
know, you can buy MC cable interlocked.

125
00:10:24,159 --> 00:10:28,039
We'll keep the topic get interlocked because
that's the most commonly used MC cable

126
00:10:28,080 --> 00:10:37,279
today. It's available both p PVC
jacketed as well as without PBC jacket It's

127
00:10:37,320 --> 00:10:41,519
the exact same cable that's used in
a wet location that has PV extruded on

128
00:10:41,559 --> 00:10:46,240
it. It's an exact same product. It just takes it and runs the

129
00:10:46,279 --> 00:10:52,879
whole cable through an extrusion, and
it extrudes a certain thickness of PVC material

130
00:10:52,120 --> 00:10:56,000
over top of the armor, and
then we print the information on top of

131
00:10:56,000 --> 00:11:01,080
that material. That's the only difference. Okay, But you cannot use mccable

132
00:11:01,200 --> 00:11:07,000
in a wet or even a damp
location. It is a dry location product

133
00:11:07,240 --> 00:11:13,440
only. Okay. Now, Item
number four says, and we're in three

134
00:11:13,519 --> 00:11:18,159
thirty dot ten. By the way, Item number four says that it can

135
00:11:18,200 --> 00:11:20,759
be exposed or concealed absolutely, So
I can run it on the surface of

136
00:11:20,759 --> 00:11:24,080
a building. If it's outside,
it's got to be PBC jacketed obviously.

137
00:11:24,120 --> 00:11:26,879
If it's inside, I can run
it on the surface. We have to

138
00:11:26,919 --> 00:11:33,600
be careful because if you run it
somewhere that is subject to physical damage and

139
00:11:33,840 --> 00:11:37,200
that may or may not be very
obvious, that's going to be an HJ

140
00:11:37,480 --> 00:11:41,159
call. Then it is not designed. Even though it goes through a crushing

141
00:11:41,320 --> 00:11:46,679
impact with this quite impressive Okay,
a thousand pounds or two thousand pounds,

142
00:11:46,679 --> 00:11:52,559
depending on the size of the conductors. That's a product standard okay UL fifteen

143
00:11:52,679 --> 00:11:56,080
sixty nine. That has nothing to
do with the application in the field.

144
00:11:56,120 --> 00:12:01,639
If somebody says it's subject to physical
damage, then mc cable couldn't be run

145
00:12:01,639 --> 00:12:05,159
there. But generally it's okay to
be exposed or concealed. So if you

146
00:12:05,200 --> 00:12:09,519
want to install it in the wall, no big deal. If you want

147
00:12:09,519 --> 00:12:11,519
to install it on the wall,
as long as it's not subject physical damage,

148
00:12:11,519 --> 00:12:13,840
no big deal. You can do
it, secure it and support it

149
00:12:13,879 --> 00:12:20,879
properly and no problem. I am
number five. People say it's is it

150
00:12:20,000 --> 00:12:24,399
direct burial? It is when it's
identified for such use, and that obviously

151
00:12:24,399 --> 00:12:30,679
will be when it is PVC jacketed. It is obviously going to be identified

152
00:12:30,679 --> 00:12:31,960
for that use. It's going to
say right on the side of the jacket,

153
00:12:33,399 --> 00:12:39,399
it'll say dB or a direct burial
use. Next one people ask about

154
00:12:39,440 --> 00:12:45,480
it. Number six cable tray were
identified for such use. Absolutely, MC

155
00:12:45,600 --> 00:12:48,360
cable king go on a cable tray
as long it's it's part of its listings

156
00:12:48,399 --> 00:12:54,399
for us in cable trays, the
manufacturers will designate that on the actual labels

157
00:12:56,159 --> 00:12:58,840
that they would put on the reel. The next one is in any race.

158
00:13:00,200 --> 00:13:05,759
Another misconception. People say, you
can't run MC cable in a raceway.

159
00:13:05,840 --> 00:13:09,159
Well, most certainly you can,
especially if it's a location where you

160
00:13:09,200 --> 00:13:13,120
think it's going to be subject to
physical damage, then you can most certainly

161
00:13:13,200 --> 00:13:16,159
run it in a raceway. Okay, but nothing prohibits it from running to

162
00:13:16,240 --> 00:13:22,279
a raceway. The only problem you
have with MC cable is the requirements to

163
00:13:22,399 --> 00:13:26,440
bond that as it comes to an
enclosure. So I tell people all the

164
00:13:26,480 --> 00:13:31,120
time and the requirements at through twelve
dot five C. If you're talking about

165
00:13:31,360 --> 00:13:35,840
enclosures, for example, I'll tell
people it'll make sure you just stop the

166
00:13:35,919 --> 00:13:39,120
raceway short so they can come out
and then actually use a connector and connect

167
00:13:39,240 --> 00:13:43,279
to the enclosure. That type of
thing. Now, we have different allowances

168
00:13:45,480 --> 00:13:48,720
in three fourteen for boxes, but
at the end of the day, you

169
00:13:48,759 --> 00:13:50,799
have to bond the armor. So
if it runs into a box and it

170
00:13:50,840 --> 00:13:54,320
doesn't connect to the box, how
are you bonding the armor. So there's

171
00:13:54,360 --> 00:13:58,679
some things you can do for that. But the key takeaway here is it

172
00:13:58,720 --> 00:14:03,279
can it be in a raceway,
aolutely commuter raceway. The next one is

173
00:14:03,600 --> 00:14:07,879
aerial cables on a messenger. A
lot of people don't realize that MC cable

174
00:14:09,039 --> 00:14:11,879
can be run on a messenger messenger
being from point A to point B,

175
00:14:13,039 --> 00:14:16,799
maybe using a steel supporting component with
a webbing from a building to a building.

176
00:14:18,240 --> 00:14:22,679
So you know, keep that mind. Now, Typically if it's an

177
00:14:22,720 --> 00:14:26,720
aerial cable, it's going to be
designated. Is that by the manufacturer?

178
00:14:26,799 --> 00:14:33,080
Not always, but there are many
manufacturers. For example, there's a manufacturer

179
00:14:33,120 --> 00:14:39,639
down in Houston, I believe it's
service Wire who specifically makes a cable that

180
00:14:39,759 --> 00:14:43,360
they call an aerial cable. Okay, the next one is number nine.

181
00:14:43,399 --> 00:14:48,440
How's it just classified locations we're specifically
permitted by other articles in this code.

182
00:14:48,279 --> 00:14:54,039
Obviously that'd be five hundred five two
five o three things like that. That's

183
00:14:54,039 --> 00:15:00,080
where you get into the necessary needs
for things like smooth and corrugated. If

184
00:15:00,120 --> 00:15:03,399
you're going to have like an MC
that's rated for a hazardous location and all

185
00:15:03,399 --> 00:15:07,279
that type of things. So remember
when you see a US is permitted in

186
00:15:07,320 --> 00:15:11,559
three thirty dot ten, it is
not germane just to interlock. This is

187
00:15:11,559 --> 00:15:16,960
this is covering all the MC types, okay, and so keep keep that

188
00:15:18,039 --> 00:15:24,879
in mine. Next one is number
ten. It says in dry locations and

189
00:15:24,960 --> 00:15:31,240
embedded in plaster finish on brick or
other masonry, except in damp or wet

190
00:15:31,279 --> 00:15:35,720
location. So it is permitted to
be embedded in plaster on brick or other

191
00:15:35,840 --> 00:15:43,320
masonry, except where there's a situation
where the wall makes be exposed to moisture,

192
00:15:43,440 --> 00:15:48,600
dampness, wetness, maybe an exterior
wall or something like that, then

193
00:15:48,720 --> 00:15:50,960
you can't do it. But if
it's a dry location inside of a building

194
00:15:52,440 --> 00:15:54,559
and they groove it out in the
plaster, let's say, and they want

195
00:15:54,559 --> 00:15:58,720
to embed it, that's that's not
a problem. If the location is going

196
00:15:58,759 --> 00:16:03,399
to be a dry location, okay, not going to be okay, if

197
00:16:03,399 --> 00:16:08,919
the location to which that wall which
is being betted embedding the MC into the

198
00:16:08,919 --> 00:16:14,759
plaster, let's say, The problem
would be if that is a damp or

199
00:16:14,799 --> 00:16:17,960
wet location in general, and you
just have to look at the location to

200
00:16:18,039 --> 00:16:22,759
determine make a distinction whether it's a
dry inside of a building unless you're in

201
00:16:22,799 --> 00:16:25,960
a spray booth or in somewhere where
they're going to host things down. Typically

202
00:16:26,039 --> 00:16:29,080
inside the building in a conditioned space
is going to be a dry location.

203
00:16:29,879 --> 00:16:33,919
So this gives you that permission.
Now, Item number eleven three thirty dot

204
00:16:33,960 --> 00:16:38,759
ten has a change that I submitted
in the twenty twenty three is to add

205
00:16:38,840 --> 00:16:41,879
the word damp in there, because
prior to the twenty twenty three it's said

206
00:16:41,960 --> 00:16:47,080
in wet locations and it didn't make
any reference to damp, although the standard

207
00:16:47,120 --> 00:16:53,840
itself you Will fifteen sixty nine also
really didn't address damp locations. So in

208
00:16:53,879 --> 00:16:59,200
the twenty twenty three edition of the
NEC, damp was added to item number

209
00:16:59,200 --> 00:17:07,720
eleven thirty ten A just making it
very clear that damp or wet locations where

210
00:17:07,839 --> 00:17:14,640
corrosive resistant jacket is provided over the
metallic sheathing and any of the following conditions

211
00:17:14,640 --> 00:17:17,359
are met. So this is where
we say, yes, I can use

212
00:17:17,480 --> 00:17:22,400
MC in a damp or a wet
location as long as I meet any of

213
00:17:22,440 --> 00:17:27,599
the following conditions. Condition A is
the metallic covering is impervious to moisture.

214
00:17:27,920 --> 00:17:32,160
Well, that would be as smooth. For example, MC would be impervious

215
00:17:32,200 --> 00:17:38,640
to moisture. Be says a jacket
resistant to moisture is provided under the metal

216
00:17:38,720 --> 00:17:44,480
covering, all right, So that
is typically not what most manufacturer are going

217
00:17:44,559 --> 00:17:48,119
to do. They leave the armor
outside and put some kind of covering underneath.

218
00:17:48,759 --> 00:17:52,799
The third one, which is C
is the insulated conductors under the metallic

219
00:17:52,839 --> 00:17:59,880
covering are listed for use in wet
location. Now ours most manufacturers are going

220
00:17:59,920 --> 00:18:07,920
to put thh in th th thhw
DASH two And of course the thhw dh

221
00:18:07,960 --> 00:18:12,519
two is perfectly okay for a wet
location, so it's typically going to be

222
00:18:12,680 --> 00:18:18,559
adequate for that. Now that can
be typically misleading for a lot of people

223
00:18:18,680 --> 00:18:21,960
because they go, okay, well, then that means I don't have to

224
00:18:22,000 --> 00:18:26,960
have anything over the metal. Well
you're gonna see in the three thirty twelves

225
00:18:26,960 --> 00:18:30,720
and then we'll move pretty rapidly from
there trying to explain the little nuances.

226
00:18:30,759 --> 00:18:34,000
But I wanted to show you permitted
uses and not permit uses as a key

227
00:18:34,039 --> 00:18:38,200
component to you to your question that
you submitted, because here's where we get

228
00:18:38,200 --> 00:18:45,400
a lot of questions from people.
And so again all of the manufacturers will

229
00:18:45,559 --> 00:18:51,839
use conductors that are insulated under the
metal covering that are actually listed for use

230
00:18:51,880 --> 00:18:56,319
in wet location. They'll have a
W signified in its nomenclature. Item number

231
00:18:56,359 --> 00:19:00,640
twelve says, we're a single conductor
KERS use and this is again an MC

232
00:19:00,759 --> 00:19:04,680
cable where you have one single conductor
running in it, all phase conductors,

233
00:19:04,759 --> 00:19:10,640
and we're used the ground of conductors
should be grouped together to minimize inductive voltage

234
00:19:10,680 --> 00:19:14,039
on the sheathing. Absolutely, so
in a rare case, we have really

235
00:19:14,240 --> 00:19:18,240
large MC that has a single conductor
in each MC. It's kind of like

236
00:19:19,599 --> 00:19:22,039
m I cable, and when you
run it, you want to make sure

237
00:19:22,039 --> 00:19:26,680
that they're grouped in close proximity because
you don't want any induced voltage on it,

238
00:19:26,720 --> 00:19:30,240
and of course that creates inductive heating
and things like that, and that

239
00:19:30,240 --> 00:19:33,559
can cause all kinds of problems.
So it's just a routing thing. But

240
00:19:33,599 --> 00:19:41,240
they do make single conductor cables for
applications where you might have rather large conductors

241
00:19:41,519 --> 00:19:47,119
and you're running multiple phases each in
an individual single conductor MC format. It

242
00:19:47,240 --> 00:19:56,000
is available all right, specific uses. This is still under uses permitted,

243
00:19:56,079 --> 00:20:00,640
but this is specific uses. It
says MC cable show be permitted to be

244
00:20:00,720 --> 00:20:06,240
installed in compliance with parts two and
three of Articles seven twenty five. So

245
00:20:06,359 --> 00:20:12,480
seven twenty five is dealing with signaling
and control that type of applications seven seventy.

246
00:20:12,839 --> 00:20:19,039
I believe it's fiber optic applications where
MC is very prominent to have some

247
00:20:19,200 --> 00:20:23,960
MC and also have the potential have
fiber optic in the same assembly. And

248
00:20:25,000 --> 00:20:30,079
so you have number one cable trays, says type MC cable installed in a

249
00:20:30,079 --> 00:20:33,400
cable trays shall comply with and it
proceeds to give you a bunch of three

250
00:20:33,519 --> 00:20:36,960
ninety twos. Well, three ninety
two is four cable trays. So it

251
00:20:36,960 --> 00:20:41,160
has its different rules that you have
to follow, how it lays in there

252
00:20:41,200 --> 00:20:44,720
with the ampacities, how it's going
to be adjusted. So again, the

253
00:20:44,759 --> 00:20:49,319
great thing about the NC is while
it's not an installation manual by any means,

254
00:20:49,640 --> 00:20:53,440
it is a good minimum standard that
lets you know, okay if you

255
00:20:53,480 --> 00:20:59,599
want to put it in a cable
tray. Here's some other code sections that

256
00:20:59,640 --> 00:21:04,559
you must follow. Right next one
is B two, which is direct burial.

257
00:21:06,240 --> 00:21:08,640
Direct burial cable should comply with three
UNDERD dot five that stepth of cover

258
00:21:10,759 --> 00:21:14,400
and that's thousand volts are less than
of course three oh five dot fifteen is

259
00:21:14,440 --> 00:21:18,880
over a thousand volts, so you've
got some appropriate applicable rules there. Next,

260
00:21:19,000 --> 00:21:23,279
installed as service entrance cable, we
said earlier it could be service cable,

261
00:21:23,799 --> 00:21:29,240
So it proceeds to tell us that
the MC cable installed as service entrance

262
00:21:29,279 --> 00:21:33,319
cable shall be permitted in accordance with
two thirty dot forty three. Course two

263
00:21:33,359 --> 00:21:37,440
thirty dot forty three is a list
of the different types of wiring methods and

264
00:21:37,480 --> 00:21:44,000
whatnot that can be used as service
entrance cable. And then either number four

265
00:21:44,039 --> 00:21:49,119
is as installed outside of buildings are
structured or as aerial cable, and it

266
00:21:49,160 --> 00:21:52,880
proceeds to tell us that the MC
cable installed outdoors of a building are structure

267
00:21:53,200 --> 00:21:59,039
or as aerial cable shall comply with
two twenty five dot ten. Course two

268
00:21:59,119 --> 00:22:03,359
twenty five is outside branch and feeders, uh three ninety six is messenger,

269
00:22:03,799 --> 00:22:07,039
and it tells us that you need
to follow dot ten and dot twelve.

270
00:22:07,079 --> 00:22:11,000
Those are going to be uses and
use is not permitted as well under messenger

271
00:22:11,000 --> 00:22:15,440
and three ninety six, So pretty
straightforward if you're doing any of those types

272
00:22:15,480 --> 00:22:18,640
of installations it's going to direct you
directly where you need to be, so

273
00:22:18,720 --> 00:22:22,279
you shouldn't have any concern all that. Now, let's talk a little bit

274
00:22:22,319 --> 00:22:29,000
about use is not permitted where you
can't use MC cable. Now, you're

275
00:22:29,039 --> 00:22:32,759
gonna know that this is a very
small list. It's it's only got two

276
00:22:32,799 --> 00:22:40,319
items, so you know, typically
from my experience, I have seen installations

277
00:22:40,400 --> 00:22:45,319
where And also I should have mentioned
that MC cable is available in both steel

278
00:22:45,240 --> 00:22:51,720
or aluminum armor, and believe it
or not, it's also available in a

279
00:22:51,920 --> 00:22:57,279
copper armor. Rare for manufacturers to
produce the copper. That's a specialty product.

280
00:22:57,720 --> 00:23:02,839
A lot of times us with the
variable frequency drive applications again, things

281
00:23:02,880 --> 00:23:06,759
like that, but the most commonly
used today is probably going to be the

282
00:23:06,799 --> 00:23:12,160
aluminum. And here's an interesting fact. Aluminum or steal armor both at the

283
00:23:12,240 --> 00:23:17,359
past the same crushing impact. I
mean, the misconception that many people might

284
00:23:17,440 --> 00:23:21,480
have is that, well, steel
has to it's got to be stronger than

285
00:23:21,480 --> 00:23:26,559
the armor, so therefore the test
ratings would be different, and that's that's

286
00:23:26,599 --> 00:23:32,359
not the case. So UL fifteen
sixty nine and then subsequently UL twenty five

287
00:23:32,440 --> 00:23:36,799
fifty six, all of the rules
for MC crushing impact are exactly the same

288
00:23:36,880 --> 00:23:41,480
whether it's steel or aluminum armors.
So if you're buying aluminum or you're buying

289
00:23:41,519 --> 00:23:45,359
steel because you think it's subject to
physical damage that it can handle it better,

290
00:23:45,920 --> 00:23:51,319
they both should be adequate, right. But they're not listed to protect

291
00:23:51,359 --> 00:23:56,279
for physical damage. So that's the
important key. If it gets damaged,

292
00:23:56,680 --> 00:24:00,599
it needs to be replaced. Okay, So here looking at the use is

293
00:24:00,599 --> 00:24:06,640
not permitted. If you have your
Code Book three three thirty twelve, use

294
00:24:06,759 --> 00:24:11,440
is not permitted Type MC cable shall
not be used under either of the following

295
00:24:11,440 --> 00:24:15,799
conditions. The very first one in
the list is where subjects of physical damage

296
00:24:15,799 --> 00:24:18,240
and we kind of talked about that
earlier. Now, some of the questions

297
00:24:18,279 --> 00:24:22,759
that people submit to me being on
a code panel, being on a servile

298
00:24:22,799 --> 00:24:27,480
code panel five and and code panel
seventeen, and you know, one of

299
00:24:27,480 --> 00:24:32,920
the things that people will ask is
like, well, is there a definition

300
00:24:32,960 --> 00:24:37,839
of physical damage? And it was
attempted and people have submitted it through the

301
00:24:37,920 --> 00:24:44,359
years. It has not been successful. It is it is never made it

302
00:24:44,400 --> 00:24:49,640
into the code. And of course
then we have terminologies like severe physical damage

303
00:24:51,279 --> 00:24:59,279
and that also has not made it
into the NC. So What has normally

304
00:24:59,480 --> 00:25:04,279
been is that they believe that that
is something that the ah J, the

305
00:25:04,319 --> 00:25:10,759
authority having jurisdiction, the electrical inspector
who's acting as the deputy for the building

306
00:25:10,759 --> 00:25:15,039
official, or the building commissioner who
is the actual age J, they have

307
00:25:15,119 --> 00:25:18,480
to make a decision whether something is
subject to physical damage. Now, my

308
00:25:18,559 --> 00:25:23,640
hope is that we use a little
common sense and realize that it might be

309
00:25:23,720 --> 00:25:27,079
running along the wall, but unless
somebody went at it with a hatchet,

310
00:25:27,599 --> 00:25:33,319
it's not really subject to physical damage. Whereas if you install in an ERIC

311
00:25:33,440 --> 00:25:36,160
where they do a lot of forklifts, a lot of things like that,

312
00:25:36,240 --> 00:25:40,759
and you're running it exposed and obviously
somebody could bang into it and it would

313
00:25:40,759 --> 00:25:45,480
be subject to physical damage. Again, while everybody would like a uniformity to

314
00:25:45,519 --> 00:25:48,359
this and a definition of this,
the problem is anytime you start defining something,

315
00:25:48,440 --> 00:25:52,960
then it locks it in and then
people start arguing about the interpretation.

316
00:25:52,119 --> 00:25:56,480
So we'll leave this one to the
HJ and you the electrician, and y'all

317
00:25:56,480 --> 00:26:00,119
can work that out. Okay,
people don't like that. Again, the

318
00:26:00,200 --> 00:26:04,920
moment that we start getting too defined
in ANEC than people bitch and wine in

319
00:26:06,000 --> 00:26:10,279
a moment where too loosey goosey with
the NEC people bitch and wine. So

320
00:26:10,400 --> 00:26:12,160
at the end of the day,
you're not going to stop people from bitching

321
00:26:12,200 --> 00:26:17,119
and whining. So at the end
of the day, physical damage is going

322
00:26:17,200 --> 00:26:19,480
to be up to you in the
HJ to make that determination, and hopefully

323
00:26:19,519 --> 00:26:23,640
the little common sense will come into
play. Now, idem number two kind

324
00:26:23,640 --> 00:26:26,960
of goes hand in hand with what
we saw earlier when it said that the

325
00:26:26,960 --> 00:26:33,480
conductor's inside as long as they're weighted
rated for a wet location and that type

326
00:26:33,519 --> 00:26:36,119
of thing, that be okay,
right, Well, here you go.

327
00:26:36,799 --> 00:26:41,599
It says, now we're exposed to
any of the destructive corrosive conditions in A

328
00:26:41,839 --> 00:26:48,759
or B unless the metallic sheathing or
armor is resistant to the conditions or is

329
00:26:48,799 --> 00:26:56,240
protected by material resistance to the condition. So this is that extruded jacketing,

330
00:26:56,519 --> 00:27:02,640
Okay, extruded all over it in
jacketing. And so there's an A and

331
00:27:02,640 --> 00:27:07,039
a B. Here A says direct
buried in the earth or embedded in concrete

332
00:27:07,119 --> 00:27:14,640
unless identified for direct burial. Now, most manufacturers that produce MC cable,

333
00:27:15,359 --> 00:27:19,920
okay, are going to produce the
MC cable and on the outside of it,

334
00:27:19,920 --> 00:27:26,000
it's going to have the extruded PVC
material typically black. Nothing says it

335
00:27:26,039 --> 00:27:32,000
has to be black, but typically
extruded black because that's the most that's the

336
00:27:32,039 --> 00:27:37,640
most purchased pelletized materials. So you
buy that in bulk. So colors cost

337
00:27:37,720 --> 00:27:41,400
you cost money. Uh, not
that black is cheap, it's just that

338
00:27:41,480 --> 00:27:47,880
it's it's the most predominantly base used, so that's what everybody uses. That

339
00:27:47,920 --> 00:27:49,640
doesn't mean you can't order it in
color, so you probably can. You're

340
00:27:49,640 --> 00:27:52,599
just gonna have to buy a crap
load of it in order to be able

341
00:27:52,599 --> 00:27:56,839
to do that. But on the
outside of it, it's going to be

342
00:27:56,880 --> 00:28:00,279
printed with direct burial and that's what
it's going to give you the permission to

343
00:28:00,599 --> 00:28:06,279
embed that into the earth or to
actually embedded in concrete. Now b is

344
00:28:06,359 --> 00:28:11,960
exposed to cinder fills, strong chlorides, caustic alkalies, or vapors of chlorine

345
00:28:12,240 --> 00:28:18,119
or of hydrochloric acids. Okay,
So this is why I tell people in

346
00:28:18,759 --> 00:28:23,359
that in UH six eighty when it
comes to swimming pool applications, they want

347
00:28:23,400 --> 00:28:27,759
to know when it talks about corrosive
environments six eight fourteen and all this other

348
00:28:27,799 --> 00:28:33,200
stuff, can you use PVC jacketed
MC. And my answer to that is

349
00:28:33,279 --> 00:28:37,039
absolutely you can. And people want
to say, but it says such as

350
00:28:37,200 --> 00:28:38,680
this, this, this, this, and this, and doesn't say MC.

351
00:28:40,200 --> 00:28:44,039
But at the very first line it
says, we're listed for the for

352
00:28:44,079 --> 00:28:48,119
the use. Well, we're talking
about a corrosive environment. You're never going

353
00:28:48,200 --> 00:28:52,039
to have a manufacturer list that for
swimming pools, even though that is an

354
00:28:52,079 --> 00:28:57,079
option. Nobody's going to do it. But it is listed for corrosive environments.

355
00:28:57,240 --> 00:29:02,319
It's in the earth. It's just
like it says right here. So

356
00:29:02,640 --> 00:29:06,039
at the end of the day,
and PBC is very resistant to these type

357
00:29:06,079 --> 00:29:10,519
of things, so it most certainly
can be used in that application and it

358
00:29:10,599 --> 00:29:15,680
is very resistant to the corrosive effects. So I'm a believer that that six

359
00:29:15,839 --> 00:29:21,039
eighty dot fourteen absolutely would allow me
to use a PBC jacketed MC and those

360
00:29:21,079 --> 00:29:26,119
applications for pool installations. Okay,
you know, and I don't really give

361
00:29:26,160 --> 00:29:29,960
a damn what anybody says. It's
I know because I helped submit that rule.

362
00:29:30,359 --> 00:29:34,240
So anyway, enough of that,
All right, what about exposed work

363
00:29:34,279 --> 00:29:38,000
again? So if you are going
to install MC, cable and disposed worth,

364
00:29:38,039 --> 00:29:44,079
then you've got three three thirty fifteen
that is titled exposed work right pretty

365
00:29:44,079 --> 00:29:48,960
straightforward. It says exposed runs of
cable except as provided in three hundred eleven

366
00:29:48,000 --> 00:29:52,359
B, which sounds like it's going
to be supportive above submitted ceilings and things

367
00:29:52,359 --> 00:29:56,799
like that. It says shall closely
follow the surface of the building finish or

368
00:29:56,880 --> 00:29:59,559
on running boards. So you don't
want you want to make sure that if

369
00:29:59,599 --> 00:30:02,000
you're going to on this MC,
you're gonna run it along the surface of

370
00:30:02,039 --> 00:30:07,039
the building. If not, it's
gonna dangle from joist to joyce or whatnot

371
00:30:07,039 --> 00:30:10,720
like that, then you want to
have it on running boards. It says

372
00:30:10,759 --> 00:30:14,559
exposed runs shall also be permitted to
be installed on the under side of joist.

373
00:30:14,599 --> 00:30:18,680
We're supported at each joyce located so
is not to be subject to physical

374
00:30:18,720 --> 00:30:23,519
damage. You know, with non
metallic sheet cable, you can run it

375
00:30:23,519 --> 00:30:27,119
on the joyce, for example in
crass bases, but it has to be

376
00:30:27,119 --> 00:30:32,880
equivalent to eight three or six two
and then you can support it underneath.

377
00:30:32,920 --> 00:30:36,000
Other than that you gotta go through
board holes or running boards. While here

378
00:30:36,000 --> 00:30:40,319
it doesn't say anything about that,
but the difference here is that if you

379
00:30:40,400 --> 00:30:44,400
do want to run it exposed let's
say on the under side of Joyce,

380
00:30:44,759 --> 00:30:51,599
then you're gonna have to secure it
at every single joist. Okay, yep.

381
00:30:52,680 --> 00:30:56,480
So ironically enough, if you run
it, if you just put up

382
00:30:56,519 --> 00:30:59,759
a running board, then you can
just secure it at its securing requirements of

383
00:30:59,799 --> 00:31:03,839
three thirty dot thirty and every six
feet and then you don't have to have

384
00:31:03,960 --> 00:31:07,480
it every choice. Because you're running
it on a running board, it's totally

385
00:31:07,559 --> 00:31:08,559
up to you. Or you could
bore holes and run it through the board

386
00:31:08,640 --> 00:31:14,759
holes and you have to worry about
it. Let's see here three thirty dot

387
00:31:14,880 --> 00:31:18,240
seventeen through or parallel to framing members. It says type MC cables shall be

388
00:31:18,319 --> 00:31:25,039
protected in accordance with three hundred dot
fo AC and D we're installed through or

389
00:31:25,160 --> 00:31:30,319
parallel to framing members. Right,
so when people talk about that, you

390
00:31:30,359 --> 00:31:36,279
have to remember that three three hundred
dot four I don't know if I said

391
00:31:36,279 --> 00:31:41,119
three thirty three hundred dot four A
talks about through wood members. Okay,

392
00:31:41,400 --> 00:31:45,519
so if you're actually installing through wood
members, then you're going to have to

393
00:31:45,559 --> 00:31:52,079
worry about things like nail plates.
Okay, the exception doesn't list MC cable.

394
00:31:52,279 --> 00:31:57,720
By the way, you know,
notches in wood, same same applications,

395
00:31:57,759 --> 00:32:02,359
So just be careful with your your
installation. Remember you're gonna have to

396
00:32:02,359 --> 00:32:07,680
still comply with three hundred for AC
and D. If you're running through framing

397
00:32:07,720 --> 00:32:12,519
members or parallel to framing members,
you still have to have those rules.

398
00:32:12,559 --> 00:32:15,279
And typically what we're talking about as
an inch and a quarter separation, that

399
00:32:15,359 --> 00:32:22,640
type of thing. Let's see talk
about radio the bending radius, because again

400
00:32:22,799 --> 00:32:30,480
people that run mc cable are bending
it all the time and they're wondering,

401
00:32:30,519 --> 00:32:32,359
Okay, what's the what's the tw
tight Can I bend this stuff? Well,

402
00:32:32,400 --> 00:32:36,519
obviously if the backside of it busts
out the convolution, then you do.

403
00:32:36,759 --> 00:32:40,960
You don't screwed up. Uh.
There is no known listed way to

404
00:32:42,200 --> 00:32:47,759
repair mc cable that has blown a
convolution, right, The only known thing

405
00:32:47,759 --> 00:32:51,640
to do is repair it. Not
mean not repair it, I mean replace

406
00:32:51,720 --> 00:32:53,720
it. There is no repair.
Now. What you want to do on

407
00:32:53,759 --> 00:32:57,000
your own, how you want to
do it on your that's up to you.

408
00:32:57,000 --> 00:32:59,599
You're the electrician, you're the one
installing it. Whatever you can get

409
00:32:59,640 --> 00:33:05,960
past inspector that, that's on you, right. But reality is, there

410
00:33:06,079 --> 00:33:14,839
is no market available repair for mccable. The convolutions have pulled apart, so

411
00:33:15,160 --> 00:33:17,279
you have to replace it, and
you can put junction boxes and make us

412
00:33:17,279 --> 00:33:22,440
splice skin those boxes. The splices
have to be accessible and all this kind

413
00:33:22,440 --> 00:33:25,359
of stuff. But at the end
of the day, you know you you

414
00:33:25,359 --> 00:33:29,759
you've got to try to install it
without damaging that convolution. Now, one

415
00:33:29,799 --> 00:33:35,079
of the ways that you can damage
convolutions is the bending radius. Now interesting

416
00:33:35,160 --> 00:33:38,240
at three thirty dot twenty four,
which again DOT twenty four is consistent with

417
00:33:38,359 --> 00:33:45,640
most of the wiring cable articles when
it comes to bending radius. In m

418
00:33:45,720 --> 00:33:51,160
IS dot twenty four trade cable everything
is dot twenty four when it comes to

419
00:33:51,200 --> 00:33:55,319
bending radius. Ironically, a little
tit bit of knowledge. There's nothing in

420
00:33:55,359 --> 00:34:01,559
the National Electrical Code about bending radius
when it comes to six hundred volt conductors

421
00:34:01,640 --> 00:34:05,359
or a thousand or less. To
be honest with you, you're going to

422
00:34:05,440 --> 00:34:08,360
have to seek the manufacturer's guidance when
it comes to single insulated conductors on what

423
00:34:08,440 --> 00:34:13,239
you can bend in what you can't, and most manufacturers will give you some

424
00:34:13,280 --> 00:34:15,719
guidelines. They're only recommendations with their
guidelines. Now, when you're over a

425
00:34:15,760 --> 00:34:22,000
thousand volts, then the NEC does
give you some bending radius rules. Maintained

426
00:34:22,119 --> 00:34:25,800
bending radius rules for conductors, right, but really not for a thousand volts

427
00:34:25,880 --> 00:34:30,519
or less. So you just be
careful. If you've been a conductor too

428
00:34:30,519 --> 00:34:34,519
tight, then you'll notice on the
backside, if it's color conductor, it'll

429
00:34:34,519 --> 00:34:38,039
start to opaque. And that is
the elongating out the insulating material, which

430
00:34:38,079 --> 00:34:43,119
is weakening and thinning. That insulated
material kind of defeats the purpose of it.

431
00:34:43,719 --> 00:34:46,159
On the inside of it, it
creates what's called a calipillar, and

432
00:34:46,199 --> 00:34:50,760
that caterpillar could split right down the
middle now, exposing the copper core,

433
00:34:51,239 --> 00:34:53,960
and that's a problem as well.
The whole purpose of the insulation is to

434
00:34:54,000 --> 00:35:00,440
help with the heat as the conductors
are currents passing through the actual conduct so

435
00:35:00,480 --> 00:35:05,880
and of course it also keeps it
from touching components that are not to be

436
00:35:06,280 --> 00:35:08,639
in contact with conductive surfaces, which
can create a hazard. So you want

437
00:35:08,639 --> 00:35:14,639
to protect the insulation. Now when
it comes to a cable, bending it

438
00:35:14,719 --> 00:35:19,199
too tight can damage it not only
the inner but the outer and cause the

439
00:35:19,239 --> 00:35:22,519
convolutions to pop loose. And that's
that's going to be a problem. Now

440
00:35:22,840 --> 00:35:27,559
you'll look and see that at three
thirty twenty four, I told you earlier

441
00:35:28,960 --> 00:35:32,360
that there is smooth sheathing, and
then there's interlocked, and of course there's

442
00:35:32,480 --> 00:35:39,679
a corrugated sheathing. Again, just
to rehash it, smooth sheathing is is

443
00:35:39,760 --> 00:35:45,280
like a continuous extrusion kind of looks
like if you've never seen it, kind

444
00:35:45,280 --> 00:35:49,039
of maybe a little like an m
I. But it is does have convolutions

445
00:35:49,039 --> 00:35:53,840
and how it's extruded, and I've
seen that mostly smooth I see in copper

446
00:35:53,920 --> 00:36:00,000
extrusion for a sheathing, But smooth
is smooth, just like it sounds.

447
00:36:00,639 --> 00:36:06,599
Interlocked armor is what most manufacturers make. It's again continuous strip of metal that's

448
00:36:06,639 --> 00:36:12,360
actually aluminum or steel. It's actually
been around the conductors, and then it

449
00:36:12,400 --> 00:36:15,800
has a little beak at the end
that kind of creates a little interlock to

450
00:36:15,840 --> 00:36:21,719
hold those convolutions together. And then
of course corrugated is a corrugated still in

451
00:36:21,760 --> 00:36:25,679
the same nature of an interlock,
but each each convolution is well and sometimes

452
00:36:27,119 --> 00:36:32,239
excuse me, sometimes referred to as
CCW. Now, the bending radius is

453
00:36:32,320 --> 00:36:37,079
for smooth can be ten times,
twelve times, or even fifteen times,

454
00:36:37,960 --> 00:36:44,960
based on the diameter of the actual
metallic sheathing. Obviously the bigger then you

455
00:36:45,000 --> 00:36:46,840
know it wants to keep fifteen times
it wants to. You know, you

456
00:36:46,840 --> 00:36:51,480
don't want to bend that too tight. It's very easy to damage the sheathing

457
00:36:51,519 --> 00:36:57,079
on that. Interlocked it's seven times
the external diameter. That's also the same

458
00:36:57,119 --> 00:37:00,719
for corrugated. So all you do
is go to the manufacturers product sheets.

459
00:37:00,800 --> 00:37:06,480
They're on everybody's website, find out
what the exterior od diameter is of their

460
00:37:06,599 --> 00:37:10,440
armor. Multiply that by seven,
and that's going to tell you that your

461
00:37:10,519 --> 00:37:15,760
bend cannot be greater than that.
It has to be at least that radius.

462
00:37:16,000 --> 00:37:20,039
Okay. So thinking of a radius, we're thinking of a ball.

463
00:37:20,159 --> 00:37:24,639
The radius is from the center out, okay, circumferences around radius is from

464
00:37:24,719 --> 00:37:29,159
center out, So you're bending it
around that radius. Okay. It's like

465
00:37:29,199 --> 00:37:32,760
bending it around a softball or baseball, if you will. And then of

466
00:37:32,800 --> 00:37:37,760
course you have diameter, which is
all the way across, okay, So

467
00:37:37,840 --> 00:37:42,039
the different dimensions that you're dealing with. But we're talking radius, okay,

468
00:37:42,280 --> 00:37:46,960
and so it's it can't be more
than seven times the external diameter, okay.

469
00:37:47,159 --> 00:37:52,119
And it says right up in the
beginning of three thirty twenty four it

470
00:37:52,199 --> 00:37:54,719
says bins of mc cables shall be
so made that the cable will not be

471
00:37:54,880 --> 00:37:59,840
damaged. Okay, so that's the
first part. If it's obvious damage to

472
00:38:00,039 --> 00:38:01,679
it, that's a problem. In
your HJ is going to call out three

473
00:38:01,719 --> 00:38:06,760
thirty dot twenty four. Now it
says the radius of the curve on the

474
00:38:06,840 --> 00:38:12,840
inter Okay, the inner part that
is to not be less than required in

475
00:38:12,920 --> 00:38:16,039
three thirty twenty four eight through c
in course smooth could be ten, twelve

476
00:38:16,159 --> 00:38:22,199
or fifteen times, but interlocked or
the core gated, it's going to be

477
00:38:22,400 --> 00:38:25,679
seven times. Now if you have
shielded conductors, so we have an MC

478
00:38:25,800 --> 00:38:31,480
cable within it's shielded conductors, then
it's twelve times the overall diameter of one

479
00:38:31,559 --> 00:38:37,599
of the individual conductors or seven times
the overall diameter. So again, depending

480
00:38:37,639 --> 00:38:40,039
on the size you have, you
may be using the individual conductor or you

481
00:38:40,119 --> 00:38:45,719
might be able to using the overall
diameter of the multi conductor cable. The

482
00:38:45,760 --> 00:38:50,639
fact is you're going to use the
value twelve times whichever is greater. So

483
00:38:50,760 --> 00:38:53,639
if the value ends up being greater
measuring for the individual conductor than it is

484
00:38:53,679 --> 00:38:59,440
for the overall diameter of the multi
conductor cable, then you're going to use

485
00:38:59,480 --> 00:39:04,639
whichever is greater In most cases,
if you have shielded MC, that's where

486
00:39:04,679 --> 00:39:07,440
you have the MC and inside that
you have a usually what is a polyfoil

487
00:39:07,559 --> 00:39:13,639
shield. Chances are you going to
use the diameter of the whole assembly,

488
00:39:14,039 --> 00:39:17,880
right, You're going to use the
overall diameter of the multi conductor cable rather

489
00:39:19,320 --> 00:39:22,920
than any individual conductor. So then
it's gonna be just seven times just like

490
00:39:22,960 --> 00:39:28,840
you would with interlocked and that's going
to be maintained. When it comes to

491
00:39:29,039 --> 00:39:34,639
securing and supporting three thirty thirty,
we have a general we have secured and

492
00:39:34,639 --> 00:39:37,639
we have supporting when we have unsupported
cable. Now, the general rule is

493
00:39:37,800 --> 00:39:43,480
MC cable should be supported and secured
by Staples. Yep, it's just regular

494
00:39:43,519 --> 00:39:49,280
Staples cable ties listed and identified for
securement and supporting. You know, I

495
00:39:49,360 --> 00:39:52,280
don't know why the hell you would
have a cable tie if it wasn't for

496
00:39:52,000 --> 00:39:57,000
securing and supporting. I mean,
that's the whole damn purpose of a cable

497
00:39:57,039 --> 00:40:00,679
tie. So I assume that most
of the cable ties you buy, especially

498
00:40:00,679 --> 00:40:05,480
if you're buying it from supply house, which are probably way overpriced, then

499
00:40:05,599 --> 00:40:07,880
they're going to be okay, and
they're going to be listed for securing its

500
00:40:07,880 --> 00:40:14,079
supporting. It also says straps,
hangers or similar fittings. What's a similar

501
00:40:14,079 --> 00:40:20,719
fitting something that is similar to one
of these that we just mentioned, same

502
00:40:20,800 --> 00:40:23,119
kind of function, same intent.
But it also goes on to say or

503
00:40:23,320 --> 00:40:29,280
other approved means designed and installed,
so it is not the damage the cables.

504
00:40:29,280 --> 00:40:32,800
So this allows for introduction of other
products, other different things that have

505
00:40:32,840 --> 00:40:36,519
come out on the market. And
as long as you can present to the

506
00:40:36,760 --> 00:40:43,679
HJ something from the manufacturer, they
are the ones that approve it okay.

507
00:40:44,360 --> 00:40:49,280
So if they're okay with it,
then okay, you can use it.

508
00:40:50,119 --> 00:40:55,840
There's companies racketeer different things like that
that make other products that are similar to

509
00:40:55,960 --> 00:41:00,639
maybe the hangers and straps, whatever
their own flavor on it things, and

510
00:41:00,639 --> 00:41:05,320
they're utilizing these allowances and the approval
means. Again, if they designed it,

511
00:41:05,400 --> 00:41:07,760
they market it, and you follow
the instructions and it's not going to

512
00:41:07,880 --> 00:41:12,800
damage the cable. I don't have
any problem with it. Again, it's

513
00:41:12,840 --> 00:41:16,079
all about supporting and securing him,
and that's the key. One thing it

514
00:41:16,159 --> 00:41:20,480
was added for clarity in the twenty
twenty three edition of the National Electrical Code

515
00:41:20,559 --> 00:41:27,519
was that MC cable fittings that's the
connector at the end shall be permitted as

516
00:41:27,559 --> 00:41:32,480
a meat as a cable support.
So if you're going from a box down

517
00:41:32,480 --> 00:41:36,519
to a luminaire and you have let's
say allows you to go six feet,

518
00:41:36,639 --> 00:41:42,320
let's just say then from the last
support it allows you to go six feet,

519
00:41:42,360 --> 00:41:46,280
Well, that cable fitting is considered
as far as it code's concerned,

520
00:41:46,559 --> 00:41:52,840
a support. So if you're going
up to six feet for example of let's

521
00:41:52,840 --> 00:42:00,920
say unsupported cable, then it's supported
at the box because of that fitting.

522
00:42:00,039 --> 00:42:05,199
And that was actually added for clarity
in the twenty twenty three edition of the

523
00:42:05,280 --> 00:42:09,199
National Electrical Code. Okay, now
let's talk a little bit about securing and

524
00:42:09,239 --> 00:42:16,719
supporting of MC cable Securing unless otherwise
permitted in this code, cable shall be

525
00:42:16,840 --> 00:42:22,559
secured at intervals not exceeding six feet. Okay, So that's your general So

526
00:42:22,840 --> 00:42:29,639
you're going to be securing it at
intervals of every six feet along its run.

527
00:42:29,719 --> 00:42:35,239
Okay. Now, interesting it says
cables containing four or fewer check us

528
00:42:35,239 --> 00:42:37,280
out. A lot of people don't
know this. Cables that are four or

529
00:42:37,320 --> 00:42:42,920
fewer conductors size no larger than ten
Okay, So if they're not longer,

530
00:42:43,119 --> 00:42:47,599
not they're not bigger than ten.
So you have a you know ten,

531
00:42:47,760 --> 00:42:54,480
three, ten, four, yeah, ten, two, twelve, three,

532
00:42:54,639 --> 00:42:58,400
twelve two, all those under ten, okay, and it's got to

533
00:42:58,480 --> 00:43:04,440
have four or fewer conducts, right, shall be secured within twelve inches of

534
00:43:04,440 --> 00:43:13,159
every box, cabinet fitting, or
other cable termination. So wherever you terminate

535
00:43:13,400 --> 00:43:17,239
that cable, okay, So you're
gonna have to have a you know,

536
00:43:17,559 --> 00:43:23,280
you're gonna be securing it within twelve
inches. Now, it says in vertical

537
00:43:23,360 --> 00:43:30,199
installations listed cables with ungrounded conductors of
two fifty kcy mill and larger shall be

538
00:43:30,199 --> 00:43:36,360
permitted to be secured at infos not
exceeding ten feet. So this is vertical

539
00:43:36,480 --> 00:43:40,199
running up because typically between floors it's
ten foot spanning and as long as it's

540
00:43:40,320 --> 00:43:45,800
two fifty kcmil. Now that's kind
of ironic to most people because the bigger

541
00:43:45,800 --> 00:43:47,639
the cables, the more the weight
you're running it vertical, you have a

542
00:43:47,639 --> 00:43:52,480
bigger, great, bigger risk of
slippage of those conductors. But remember,

543
00:43:53,039 --> 00:44:00,480
securing the cable really is irrelevant to
the conductors inside of it. So unless

544
00:44:00,480 --> 00:44:02,760
you have a product that's designed for
those conductors not to slip, and normal

545
00:44:02,920 --> 00:44:07,400
MC cable has to go through a
pullout test, so it shouldn't slip if

546
00:44:07,400 --> 00:44:12,719
the convolutions are compressed onto the conductors
like they're supposed to be. Sometimes it

547
00:44:12,719 --> 00:44:17,000
can get a little loosey goosey,
but it's supposed to be in a situation

548
00:44:17,039 --> 00:44:21,840
where the normal changes of direction in
the run of an MC is going to

549
00:44:21,880 --> 00:44:24,679
add enough frictions so those conductors do
not slip. If you're running a pure

550
00:44:25,199 --> 00:44:30,800
vertical run from a box to a
box and it's extended run, say one

551
00:44:30,280 --> 00:44:35,639
hundred and fifty feet, then be
careful. You have to use a product

552
00:44:35,679 --> 00:44:39,920
that will secure those conductors inside or
put some offsets in it in order to

553
00:44:39,960 --> 00:44:46,519
keep from slippage taking place. Sometimes
that's easier said than done. But people

554
00:44:46,639 --> 00:44:51,480
like to refer back to the rules
in three hundred nineteen. I think for

555
00:44:51,920 --> 00:44:57,280
supporting conductors that only applies to race
ways. That doesn't apply to cables.

556
00:44:57,360 --> 00:45:01,280
So again we might tell you to
follow that and where to put your off

557
00:45:01,320 --> 00:45:07,719
sets, but that's not even really
applicable to the MC cable, to be

558
00:45:07,760 --> 00:45:12,639
honest with you, let's see.
Oh, the other thing that people ask

559
00:45:12,719 --> 00:45:15,280
me with this question is and the
obvious is okay, Well, I understand

560
00:45:15,320 --> 00:45:21,679
if it's cables containing four or fewer
conductors and they're not larger than ten,

561
00:45:22,400 --> 00:45:28,079
that they have to be secured within
twelve inches. Well what if it's more

562
00:45:28,239 --> 00:45:31,079
What if it's larger than that,
or it's a ten with more than four,

563
00:45:32,000 --> 00:45:35,960
then you can go all the way
up to six feet. You don't

564
00:45:36,000 --> 00:45:38,679
have to do it within twelve inches. Okay, makes sense because the general

565
00:45:38,760 --> 00:45:43,760
rule is to secure at every six
feet. Okay, this is only talking

566
00:45:43,800 --> 00:45:47,360
about securing a cable within twelve inches
of a box. Win it's four or

567
00:45:47,400 --> 00:45:52,920
fewer conductors and they're no larger than
ten, awg, Okay, that's when

568
00:45:52,960 --> 00:45:57,480
you have to do it within twelve
inches. So quite interesting that people don't

569
00:45:57,519 --> 00:46:01,000
know that when they're doing feeder applications
and they're running MC cable and they are

570
00:46:01,079 --> 00:46:07,000
told to secure that within twelve inches
and they not necessarily have to, although

571
00:46:07,000 --> 00:46:10,480
it, you know, probably easier
to get all your folks on the same

572
00:46:10,559 --> 00:46:14,519
page. Anyway, you're gonna do
it within twelve inches, but most people

573
00:46:14,559 --> 00:46:15,760
don't know that you could go up
to six feet on that. So if

574
00:46:15,800 --> 00:46:20,360
an inspector fails you because you're not
secured within twelve inches, and it's a

575
00:46:20,519 --> 00:46:23,880
larger MC than you're like, dude, I can go up to six feet.

576
00:46:24,119 --> 00:46:30,000
These aren't four or fewer conductors sized
ten and less. So just just

577
00:46:30,079 --> 00:46:34,320
so you know, still gotta put
a strap in your ownwhere and so,

578
00:46:34,480 --> 00:46:36,840
hey, you want to stop an
argument, put it at twelve inches and

579
00:46:36,840 --> 00:46:38,440
nobody's going to argue. But I
just want you to know the rules there.

580
00:46:39,159 --> 00:46:43,119
Now, what about that was securing. Now, let's talk about supporting.

581
00:46:44,519 --> 00:46:47,559
Now. It says unless otherwise permitted
in this code, and it will

582
00:46:47,599 --> 00:46:52,559
give you when it says unless otherwise
permitted, you're gonna see in a second,

583
00:46:52,599 --> 00:46:57,039
we have what's called unsupported cables.
So that's a that's an area where

584
00:46:57,039 --> 00:47:02,679
it's otherwise permitted. It's it's given
you some allowances to have unsupported cable.

585
00:47:04,119 --> 00:47:06,880
So, but the general rules are
what we're talking about when it comes to

586
00:47:06,960 --> 00:47:10,559
supporting, unless otherwise forbidden in this
code, cable shall be supported at intervals

587
00:47:10,679 --> 00:47:16,639
not exceeding six feet, so every
six feet, okay. It also goes

588
00:47:16,679 --> 00:47:21,679
on to say horizontal runs of MC
cable like running through framing members, things

589
00:47:21,719 --> 00:47:24,480
like that, running it through joys, things like that. It says installed

590
00:47:24,480 --> 00:47:30,239
in wood or metal framing members,
or similar supporting means, like maybe across

591
00:47:30,320 --> 00:47:36,119
the let's say, webbing of the
ceiling, webbing joists, or whatnot.

592
00:47:37,119 --> 00:47:44,400
It says that running across that shall
be considered supported and secured means you don't

593
00:47:44,400 --> 00:47:46,079
have to do any it's if you're
running it through board holes or you're running

594
00:47:46,079 --> 00:47:52,639
through metal framing members, it's considered
supported and while it's not physically secured,

595
00:47:52,119 --> 00:47:57,599
it's not going anywhere. So it's
considered to be secured as well, as

596
00:47:57,679 --> 00:48:00,519
long as he supports don't exceed six
feet. So if they're if they're eighteen

597
00:48:00,559 --> 00:48:05,159
inches on center, no big deal. Twenty four inches on center, no

598
00:48:05,199 --> 00:48:08,599
big deal. But if you have
running through framing members or running through joists

599
00:48:08,599 --> 00:48:14,000
and the ceiling or the eye beams
metal beams, and you have a span

600
00:48:14,159 --> 00:48:17,000
that's more than sea six feet,
then you have a problem, right,

601
00:48:17,079 --> 00:48:21,199
But if the spans aren't more than
six feet, then they're considered secured and

602
00:48:21,239 --> 00:48:25,800
supported. You don't have to do
anything different to that. Let's see now,

603
00:48:25,920 --> 00:48:37,480
let's go, let's see here.
Unsupported cables D. It says type

604
00:48:37,599 --> 00:48:45,920
MC cable shall be permitted to be
unsupported and unsecured where the cable, where

605
00:48:45,920 --> 00:48:51,159
the cable complies with any of the
following. All right, we're we got

606
00:48:51,199 --> 00:48:54,199
three conditions that we don't have to
support and secure it. Well. The

607
00:48:54,199 --> 00:49:01,320
first one is if you're gonna fish
this cable between access points through concealed spaces

608
00:49:01,519 --> 00:49:06,960
in finished buildings or structures, and
supporting is impracticals. So this is not

609
00:49:07,079 --> 00:49:10,440
a new installation application. This is
remodel retrofit. Whatever you're trying to fish

610
00:49:10,480 --> 00:49:14,559
it in. It just doesn't make
sense. You can get from point A

611
00:49:14,639 --> 00:49:17,360
to p A to B through these
voids, then this is going to allow

612
00:49:17,360 --> 00:49:21,079
you to do it. Now,
here's what's interesting. And I got to

613
00:49:21,119 --> 00:49:22,880
ask this question, and I,
you know, I really know how to

614
00:49:22,880 --> 00:49:28,480
answer it because the manufacturers don't test
for this. How far can you do

615
00:49:28,519 --> 00:49:30,400
that? And is there a size
limitation? What if I want to run,

616
00:49:30,679 --> 00:49:37,559
of shit, I don't know to
fifty kc MC through a void?

617
00:49:37,360 --> 00:49:42,960
How far can I run this fished
MC cable from point A to point B

618
00:49:43,119 --> 00:49:47,800
before I have a to worry about
the weight and the convolutions pulling loose or

619
00:49:47,840 --> 00:49:55,320
whatever. The code doesn't say it
really doesn't give us that distance. Okay,

620
00:49:57,440 --> 00:50:02,360
so common sense has to be your
here. This is clearly a retro

621
00:50:02,760 --> 00:50:07,719
fit at kind of application. Not
I would think not in a new construction,

622
00:50:07,760 --> 00:50:10,440
because to be a finished building or
structure, I would think it already

623
00:50:10,440 --> 00:50:14,400
has to be commissioned. CEO is
shoot and this is just somebody coming back

624
00:50:14,400 --> 00:50:15,519
trying to add and this is an
easy way to get from point eight to

625
00:50:15,559 --> 00:50:22,519
point big A. D two says
is not more than six feet in length

626
00:50:22,599 --> 00:50:25,519
from the last point of cable support. And remember we talked about that was

627
00:50:25,559 --> 00:50:30,480
the reason I had to make it
clear that the fitting can be considered a

628
00:50:30,599 --> 00:50:35,039
support. Okay, So it says
not more than six feet in length from

629
00:50:35,079 --> 00:50:38,920
the last point of cable support the
clamp to the point of connection to a

630
00:50:39,039 --> 00:50:45,000
LUMINAIIR or other electrical equipment. Okay, so it's not just luminaires. Might

631
00:50:45,039 --> 00:50:50,000
have another piece of electrical equipment in
the space where you're going to be doing

632
00:50:50,000 --> 00:50:54,400
this from and the cable end point
of connection are within. An accessible ceiling

633
00:50:54,760 --> 00:50:59,760
doesn't have to be readily accessible,
just has to be an accessible ceiling,

634
00:51:00,360 --> 00:51:04,480
right it's above a suspended ceiling,
for example, is an accessible ceiling?

635
00:51:05,559 --> 00:51:10,320
I know? Number three D three
says is type MC of the is type

636
00:51:10,400 --> 00:51:16,800
MC of the interlocked armor type in
length not exceeding three feet from the last

637
00:51:16,880 --> 00:51:22,239
point where it is securely fastened that
would be at the connector at the box,

638
00:51:22,920 --> 00:51:28,960
and is used to connect equipment where
flexibility is necessary to minimize the transmission

639
00:51:29,000 --> 00:51:35,239
of vibration from equipment, or to
provide flexibility for equipment that requires moving after

640
00:51:35,320 --> 00:51:38,719
installation. So you might have a
motor application or something like that piece of

641
00:51:38,760 --> 00:51:46,000
equipment that needs that flexibility, or
maybe it's gonna creates a vibration and whatnot

642
00:51:46,039 --> 00:51:50,920
and you need that. Well here
you as long as it's of the interlocks

643
00:51:50,960 --> 00:51:54,400
type right, and it's not longer
than three feet, then it can go

644
00:51:54,519 --> 00:51:59,920
unsupported from the connector, which is
considered a support to the piece of equipment,

645
00:52:00,119 --> 00:52:06,800
and that would be perfectly acceptable.
Okay, all right, we're gonna

646
00:52:06,840 --> 00:52:12,079
jump to to H three thirty dot
eighty and we're almost done. And for

647
00:52:12,079 --> 00:52:14,800
those that are over were watching on
TikTok, if you had any questions and

648
00:52:14,840 --> 00:52:19,119
you're posting them in there, I
will answer your questions after this session.

649
00:52:19,559 --> 00:52:23,239
So again, for those out there
that are following along, this is something

650
00:52:23,280 --> 00:52:27,559
new we're doing and we will answer
those questions on TikTok. So post your

651
00:52:27,599 --> 00:52:30,840
questions. I will do my best
to answer them after our our podcast.

652
00:52:31,920 --> 00:52:37,079
All right, so three thirty dot
eighty ampacity. The ampacity of mc cable

653
00:52:37,159 --> 00:52:43,280
shall be determined in accordance three ten
dot fourteen or three fifteen dot sixties.

654
00:52:43,320 --> 00:52:45,639
So three ten dot fourteen's gonna be
a thousand volts or least three fifteen's gonna

655
00:52:45,639 --> 00:52:52,039
be over a thousand volts for fourteen
and larger conductors, and in accordance with

656
00:52:52,159 --> 00:52:57,199
table four zero two dot five for
eighteen and sixteen. So that is going

657
00:52:57,280 --> 00:53:04,280
to be these smaller gauges and dealing
with like chords and things like that.

658
00:53:05,679 --> 00:53:10,400
Let's see here, and I don't
know that that table is for fixture wire,

659
00:53:10,719 --> 00:53:15,360
by the way, so there's an
ampacity associated with that, and that's

660
00:53:15,360 --> 00:53:16,920
what you know. That's just giving
you a reference of where you need to

661
00:53:16,960 --> 00:53:22,320
go if you're looking for ampacities for
those type of conductors. Most of the

662
00:53:23,280 --> 00:53:29,119
eighteens and things like that that are
used in like an mc PCs are you

663
00:53:29,159 --> 00:53:31,960
know, the ampacities are pretty low
anyway, they're being used for zero to

664
00:53:31,960 --> 00:53:38,480
ten vote control, and so that's
why they're in there, so you're not

665
00:53:38,599 --> 00:53:43,360
really any issue with ampacities for most
of the uses for that type of product.

666
00:53:43,400 --> 00:53:46,440
That's called an MCPCS by the way, Uh some companies call it MC

667
00:53:46,639 --> 00:53:54,480
luminary. We call it a donc
are. We call that MC LED And

668
00:53:54,599 --> 00:54:00,840
you know what I think. I
think South Wire calls it MC duo.

669
00:54:00,440 --> 00:54:05,679
Okay, so all of the same
thing. But they're gonna have zero to

670
00:54:05,719 --> 00:54:08,000
ten volt. That's just for the
control aspect of it, kind of utilizing

671
00:54:08,039 --> 00:54:12,199
the allowances in seven twenty five to
be able to do that, because typically

672
00:54:12,239 --> 00:54:15,800
you can't have class two class three
in the same raceway with a power and

673
00:54:16,079 --> 00:54:22,559
power so you have to have a
separation. Well, this exploits that by

674
00:54:22,639 --> 00:54:30,760
using MC that complies with seven twenty
five because it has thirty mills of sheathing

675
00:54:30,840 --> 00:54:37,840
wrapped around those those zero to ten
vault conductors, and so that creates a

676
00:54:37,880 --> 00:54:39,639
separation and that's how we you know, that's how you get around that.

677
00:54:43,039 --> 00:54:47,079
Let's see here. Okay, so
MC cable and a cable tray three thirty

678
00:54:47,119 --> 00:54:50,840
dot eighty again is going to send
you up to three ninety two dot eighty,

679
00:54:51,280 --> 00:54:53,239
no problem there. Ultimately it's still
probably going to send you to three

680
00:54:53,280 --> 00:54:57,679
ten to sixteen anyway, but that's
depending on how you install them in a

681
00:54:57,719 --> 00:55:04,920
cable tray. Single type MC cables
we talked about earlier. It talks about

682
00:55:04,960 --> 00:55:08,599
that and tells you how you have
to center them and all that type of

683
00:55:08,639 --> 00:55:15,320
thing and the configurations and whatnot,
and give you some guidance on that and

684
00:55:17,199 --> 00:55:23,360
basic thing I can tell you about
ampacities. So the impacity of MC cable.

685
00:55:23,519 --> 00:55:29,440
The inner conductors are typically going to
be rated ninety degree from all manufacturers

686
00:55:29,440 --> 00:55:32,960
that make MC cable. It's ninety
degree, but you really can't use the

687
00:55:34,039 --> 00:55:37,840
ninety unless all terminals are all equipment
it's rated ninety, So we end up

688
00:55:37,880 --> 00:55:44,119
being stuck with the seventy five rated
insulation. Now people will say, well

689
00:55:44,199 --> 00:55:47,079
does it one ten, fourteen c
one say that it's one hundred amps are

690
00:55:47,199 --> 00:55:52,920
less or fourteen through one that it's
got to be under the sixty degree.

691
00:55:53,039 --> 00:55:57,960
That's true. So if I was
using that product and I had a weakest

692
00:55:58,000 --> 00:56:01,920
link like a sixty degree rated terminal
or sixty degree rated terminal on a piece

693
00:56:01,920 --> 00:56:07,119
of equipment, then that's the weakest
link theory. Now, since those conductors

694
00:56:07,159 --> 00:56:14,880
inside of it are actually rated per
seventy five really ninety, but since we're

695
00:56:14,880 --> 00:56:17,480
going to realize that we can't use
ninety except for adjustment and corrective purposes,

696
00:56:19,000 --> 00:56:22,440
then typically it's gonna be seventy five. Because if you look at one ten

697
00:56:23,159 --> 00:56:29,400
dot fourteen C one, I can't
remember if it's C one three or whichever

698
00:56:29,400 --> 00:56:30,880
it is, and I don't feel
like going to looking, but that's gonna

699
00:56:30,920 --> 00:56:36,519
tell me. Hey, if the
insulation is rated higher than sixty, if

700
00:56:36,519 --> 00:56:39,679
it's at least seventy five, then
I can use it at the seventy five

701
00:56:40,960 --> 00:56:45,639
capacities. Again, considering that we
have to worry about the terminals and what

702
00:56:45,719 --> 00:56:51,280
their ratings are, but typically the
breaker is going to be at least seventy

703
00:56:51,280 --> 00:56:54,639
five, and typically to day the
lug on the equipment's going to be seventy

704
00:56:54,639 --> 00:56:58,920
five. So even if it was
under one hundred amps, I'm still gonna

705
00:56:58,920 --> 00:57:04,760
be able to use the seventy five
five in mccable because of the allowances in

706
00:57:04,840 --> 00:57:09,079
one ten fourteen, C one three
or C one A three shiit I can't

707
00:57:09,119 --> 00:57:15,039
remember, but it's it's in there, and go look at it, and

708
00:57:15,039 --> 00:57:19,880
then it's okay to use it at
the seventy five it's all about the weakest

709
00:57:19,920 --> 00:57:22,239
link. And we have a video
on that called de Rating Demystified. If

710
00:57:22,239 --> 00:57:25,440
you have not watched that video yet, we have a three point zero edition

711
00:57:25,519 --> 00:57:29,960
coming out in a couple of weeks. You definitely want to check that out.

712
00:57:30,000 --> 00:57:34,320
But it's still relevant in the de
Rating Demystified. It's probably only available

713
00:57:34,480 --> 00:57:40,480
now over on fasttrackstube dot com.
Hey, you know what fasttrackstube dot com

714
00:57:40,519 --> 00:57:46,079
is. That's our exclusive video platform
where we have videos that we've all vetted

715
00:57:46,400 --> 00:57:52,079
from different educators and even myself that's
available for you to watch up there.

716
00:57:52,079 --> 00:57:54,639
It's amazing deal. One hundred and
twenty five dollars annually. You get unlimited

717
00:57:54,679 --> 00:58:00,480
access to it. We have blogs
up there too, but you can get

718
00:58:00,519 --> 00:58:06,400
twenty five dollars off by using two
five of all capitals now two five off

719
00:58:06,519 --> 00:58:10,280
at checkout, and you can get
twenty five bucks off the annual subscriptions hundred

720
00:58:10,280 --> 00:58:15,840
bucks. Dude. There's a series
in there for swimming pools that is worth

721
00:58:15,840 --> 00:58:20,960
the money, just that series with
me and Vince Della Croach and also we

722
00:58:21,000 --> 00:58:24,079
are scheduled to do a new series
for the twenty twenty three on that Here

723
00:58:24,079 --> 00:58:27,480
in a couple of months, he's
coming out to the studio and we're gonna

724
00:58:27,519 --> 00:58:30,400
record it like we did. That's
gonna be awesome to have him out here.

725
00:58:30,239 --> 00:58:34,440
But we're also have a grounding and
bonding series in there that's like twelve

726
00:58:34,559 --> 00:58:38,360
hours long. Okay, four episodes. Look, you're gonna get your money

727
00:58:38,400 --> 00:58:44,000
back and investing in fast Tracks Tube. Trust me. It's and it's getting

728
00:58:44,039 --> 00:58:47,360
better and better. It's we're excited
about that platform. Okay, enough of

729
00:58:47,400 --> 00:58:52,760
that. So if you ever wanted
to know, or you ever got confused

730
00:58:52,800 --> 00:58:57,880
about the construction of a product,
you can always go if withinc you can

731
00:58:57,880 --> 00:59:01,320
go to Part three tells you what
conductors are in there. So the hot

732
00:59:01,320 --> 00:59:06,280
conductors, the ground of conduction equipment
ground conductors. The minimum conductor sizes shall

733
00:59:06,320 --> 00:59:10,679
be fourteen gauge copper nickel. Okay, how many nickel conductors they have you

734
00:59:10,719 --> 00:59:17,199
ever seen copper nickel, nickel coded
copper, and twelve awg or copper clad

735
00:59:17,199 --> 00:59:23,119
aluminum. Okay. The control and
signal conductors, minimum conductor sizes shall be

736
00:59:23,320 --> 00:59:31,840
eighteen gauge and a course copper nickel, nickel coded copper and course fourteen of

737
00:59:32,239 --> 00:59:42,960
copper clad aluminum and twelve awg aluminum. Okay, And so you can go

738
00:59:43,000 --> 00:59:45,559
there and look, and it kind
of tells you what to expect in your

739
00:59:45,599 --> 00:59:51,800
ear MC cable equipment ground of conductors
where type MC cable is used to provide

740
00:59:52,360 --> 00:59:55,280
is used to provide an equipment grounding
conductor, it shall comply with two fifty

741
00:59:55,559 --> 01:00:01,039
one eighteen eight ten and two fifty
one twenty two. Of course, one

742
01:00:01,119 --> 01:00:05,239
twenty two is what we do to
size the equipment ground It's based on the

743
01:00:05,239 --> 01:00:10,639
overcurrent device, right, and in
of course two fifty eight eight ten is

744
01:00:10,920 --> 01:00:19,480
part of that list that tells you
what qualifies as an equipment grounding conductor,

745
01:00:19,880 --> 01:00:22,840
right, what can be an equipment
ground and conductor? And it kind of

746
01:00:22,880 --> 01:00:27,639
gives a list of these items.
Okay. Now with mc cable, it's

747
01:00:27,679 --> 01:00:31,039
pretty clear. It says mc cable
should be provided with an effective ground fault

748
01:00:31,039 --> 01:00:37,719
current path in accordance with one or
more of the following, right, And

749
01:00:37,760 --> 01:00:39,800
there's three here, there's an A
B in a C number one. It

750
01:00:39,840 --> 01:00:45,719
says it contains an insulated or uninsulated
equipment grounding conductor in compliance with two fifty

751
01:00:45,960 --> 01:00:49,800
one eighteen one. And that's just
saying it could be bare covered or insulated,

752
01:00:50,360 --> 01:00:52,159
and that can be an equipment ground, and that's what you usually see

753
01:00:52,199 --> 01:00:59,920
inside of your mc cable. The
next one that says the the combined metal

754
01:01:00,119 --> 01:01:07,679
sheathing and uninsulated equipment grounding slash bonding
conductor of interlocked metal tape the mc cable

755
01:01:07,719 --> 01:01:12,320
that is listed identified as an equipment
ground. So that's the specialty products like

756
01:01:12,519 --> 01:01:17,800
mcap Encore was a smart ground that's
a specialty product now that can only go

757
01:01:17,880 --> 01:01:22,800
up to size six conductors, whereas
obviously the one with the insulated or uninsulated

758
01:01:22,800 --> 01:01:27,719
equipment ground can go up to two
thousand KC mills and larger if you if

759
01:01:27,760 --> 01:01:32,119
you can get it, they'd be
So this covers all of that. And

760
01:01:32,159 --> 01:01:37,360
of course the last one that says
the metallic sheathing or the combined metal sheathing

761
01:01:37,519 --> 01:01:43,639
and equipment grounding conductor of the smooth
and corrugated tube type mc cable that is

762
01:01:43,679 --> 01:01:50,400
listed and identified as an equipment grounding
conductor. Okay, so you have just

763
01:01:50,519 --> 01:02:00,880
another allowance for a metal sheath or
the combination metal sheath and equip mcgrantic conductor

764
01:02:00,960 --> 01:02:05,920
in the smooth or the corrugated so
the metal sheathing in most of those products

765
01:02:06,599 --> 01:02:13,760
will also qualify as an equipment granting
contorl Okay. That's most manufacturers again make

766
01:02:13,800 --> 01:02:20,119
the interlocked they don't make the smooth
or cork gated. Although they're available,

767
01:02:20,320 --> 01:02:22,840
you can you can go out and
get them the most certainly available in the

768
01:02:22,840 --> 01:02:28,199
market. All right, I think
that's pretty much hopefully I answered all of

769
01:02:28,199 --> 01:02:32,559
your questions that you had. The
only last one that probably need to cover

770
01:02:34,719 --> 01:02:39,639
is if you do have questions on
UH insulations, the ratings or whatnot,

771
01:02:39,719 --> 01:02:45,000
then three thirty dot twelve talks about
insulation. Three thirty one sixteen is talking

772
01:02:45,039 --> 01:02:47,719
about the sheathing, and that's where
you can get kind of some additional information.

773
01:02:47,800 --> 01:02:52,440
That says metal sheathing schell be one
of the following smooth metallic sheathing,

774
01:02:52,960 --> 01:03:00,199
corrugated metallic sheathing, or interlocked metal
tape armor okay. And it goes want

775
01:03:00,199 --> 01:03:06,079
to tell you the metallic sheathings shall
be continuous in close fitting. Says a

776
01:03:06,280 --> 01:03:12,119
non magnetic sheathing or armor shall be
used on single conductor okay, so non

777
01:03:12,159 --> 01:03:17,840
magnetic aluminum. It says supplemental protection
of the outer covering of corrosive resistant material

778
01:03:19,280 --> 01:03:23,920
shall be permitted and shall be required
where such protection is needed. So that's

779
01:03:23,960 --> 01:03:29,119
PVC jacketed MC. So that's where
you get your instructions for that. And

780
01:03:29,239 --> 01:03:32,719
at three thirty one sixteen and it
says the sheathing shall not be used as

781
01:03:32,719 --> 01:03:37,639
a current care and conductor. That's
a that should be a no brainer.

782
01:03:40,679 --> 01:03:46,480
And lastly, howzardous classified locations were
required to be marked mc l HL being

783
01:03:46,519 --> 01:03:51,599
howzardous location, the cable shall be
listed and shall be have a gas and

784
01:03:51,800 --> 01:04:00,239
vapor tight continuous corrugated metallic sheath,
an overall jacket of suitable polymeric material plastic,

785
01:04:01,119 --> 01:04:06,320
and a separate equipment grunting conductor if
you want to create an mc h

786
01:04:06,679 --> 01:04:13,840
L product. Okay, all right, hopefully I've answered your question on all

787
01:04:13,880 --> 01:04:17,199
the things to really know about MC
cables. Obviously, if you have any

788
01:04:17,239 --> 01:04:19,880
follow up questions, you know what
you can do. All you gotta do

789
01:04:19,960 --> 01:04:28,360
is go to Paul Abernati dot com
and reference this episode and maybe rehash the

790
01:04:28,440 --> 01:04:30,039
question you want to ask me,
because I don't go back and listen to

791
01:04:30,119 --> 01:04:34,400
episodes, and I'm a one take
guy, so I don't do things multiple

792
01:04:34,400 --> 01:04:36,920
times. When I turn the MICA
on, I'm just rolling. Okay,

793
01:04:38,159 --> 01:04:41,360
So if you have a question,
just go to Paul Abernathy dot com and

794
01:04:41,480 --> 01:04:45,760
feel free to post it and I
will answer your question either in a follow

795
01:04:45,800 --> 01:04:49,079
up email or it could be selected
for an upcoming episode of Let's Ask Paul.

796
01:04:49,119 --> 01:05:05,199
Until next time, folks, stay
safe, God bless Boo Boo booth

797
01:05:05,840 --> 01:05:18,960
as Boo Boo ask both. Nope,
